EVALUASI SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK KONSTRUKSI BENDUNGAN PLTM DENGAN METODE IBPRP Ageng Suigh; Lia Laila Nurjamilah
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The implementation of the Occupational Health and Safety Management System (SMK3) in the Mini-hydropower Plant (PLTM) dam construction project in Talaga District, Majalengka Regency is crucial for minimizing work accidents. The purpose of this study is to analyze the level of application of OHS principles and identify potential hazards and work risks using the IBPRP (Hazard Identification, Risk Assessment, and Risk and Opportunity Control) method. The research was conducted using field observation methods and the collection of primary and secondary data from construction activities, including the use of Personal Protective Equipment (PPE), implementation of work procedures, and safety supervision. The results showed that the implementation of SMK3 in this project has run well, characterized by high awareness of the use of PPE such as helmets, safety shoes, vests, and gloves. Based on the results of the risk assessment, most of the potential hazards are categorized as small to medium risks and can be controlled through the application of appropriate work procedures and intensive field supervision. The OHS performance indicator of "Zero Accident" was successfully achieved because the application of the OHS system was carried out systematically starting from planning, implementation, to project evaluation. The implementation of OHS in the PLTM drainage project not only protects the safety of workers, but also improves overall work efficiency and productivity.