Teknis Pemasangan Bore Pile Menggunakan Winch EK-60 dan Sistem K3 pada Gedung The Parlor Hills Putra Andhika Mahardika; Lia Laila Nurjamilah
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Bore pile foundations are deep foundations used to transfer structural loads to competent soil layers at a certain depth. Proper construction methods, suitable heavy equipment, and effective Occupational Safety and Health (OHS) practices are essential to ensure work quality and safety. This internship was conducted at The Parlor Hills Building Construction Project, Jalan Ranca Bentang No. 9, Bandung Regency, West Java, where PT Bina Rizky served as the contractor under the supervision of Citra Retrofita Consultants. The study aimed to describe the technical implementation of bore pile installation using the EK-60 Winch and evaluate the application of the OHS system during construction. Data were collected through direct field observation, interviews, and project documentation. The bore pile installation process consisted of equipment mobilization, drilling point setting, drilling, casing installation, borehole cleaning, reinforcement placement, and concrete casting using the tremie method. The results indicate that the EK-60 Winch improved the efficiency and stability of lifting operations, particularly in confined working areas. In addition, the implementation of OHS measures, including the use of personal protective equipment, equipment inspections, safety signage, and toolbox meetings, minimized workplace hazards and supported safe and efficient project execution.