Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS KEBUTUHAN BIAYA PEMELIHARAAN DAN PERBAIKAN JALAN BERDASARKAN PENILAIAN METODE PCI Indra Permana; Eka Juliar Rahayu; ase Dian Heryadiana
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The condition of the Cirebon Bandung road pavement STA 55+000 to STA 56+000 has experienced road damage that has an impact on the comfort of road users, this damage condition is functional damage that includes comfort and safety for road users, therefore the need for road repairs aimed at comfort and maintaining performance and road life plans. In the Pavement Condition Index (PCI) Method, the main factors to determine the severity of each segment are 3 factors, namely the type of road damage, the level of damage to the road and the number or density of road damage. In the Pavement Condition Index Method is a method that has a numerical index whose value is from 0 to 100. For a value of 0 has a description of very bad road conditions and a value of 100 indicates that the road pavement is in perfect condition in the segment studied. Based on the results of the study of Cirebon Bandung Road STA 55+000 to STA 56+000 there are 2 types of damage namely Crocodile Skin Cracks. In the analysis results of the Pavement Condition Index Method, the average PCI value is 95% with a description of very good road conditions. The recommended repairs for Cirebon Bandung road pavement STA 55+000 to STA 56+000 are Patching repairs by replacing 3 layers, namely AC WC, AC BC and AC BASE depending on the level of road damage. The total cost of repairing Cirebon Bandung road STA 55+000 to STA 56+000 with Patching repairs is Rp. 38,530,867.92.