ANALYSIS OF RISK MANAGEMENT IN BUILDING WORKERS OF SMAN 5 BRAWIJAYA BUILDING KEDIRI Endik Setiawan; Budi Witjaksana; Hanie Teki TJendani
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 2 No. 4 (2023): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v2i4.987

Abstract

Construction projects are a job sector that has level risks and work accident , this is caused consequence low awareness to application Occupational Safety and Health (K3) and in accordance with the regulations applicable legislation. Often application of K3 to a construction project considered only as a cost expense , not as an investment to prevent happen work accidents but can give level loss of the construction project. Kediri is city biggest third in East Java province after Surabaya and Malang according to population . Kediri City is city the oldest in East Java. SMAN 5 Taruna Brawijaya Kediri, East Java was built with the aim of support teaching and learning activities. Results of the analysis it can be categorized Work accidents among construction workers at SMAN 5 Brawijaya Kediri : Indiscipline workforce , Do not have standardization of good and clear K3 implementation, Refuse recommendation use of personal safety equipment , No evaluation system regarding the implementation of work in implementing K3, and unclear division of tasks in formation organization so it is not clear how to implement it.
COST ANALYSIS ON THE CONSTRUCTION OF SPORTS FACILITIES IN KEDEWAN SUB-DISTRICT, BOJONEGORO DISTRICT WITH EVM (EARNED VALUE METHOD) Sanda Praja Riduwan; Budi Witjaksana; Hanie Teki TJendani
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 2 No. 4 (2023): NOVEMBER
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v2i4.988

Abstract

The implementation of construction work has the main targets in construction management, such as construction costs, quality of construction work and construction implementation time. Construction activities can be declared successful in their management if they produce work products with the quality criteria that have been determined, on time, and according to the agreed costs. Using EVM (Earned Value Method) in project management can be used to determine cost performance and implementation time during the project and the indicators used for analysis include: BCWP (Budget Cost of Work Performance), BCWS (Budget Cost of Work Schedule), ACWP (Actual Cost of Work Performance), SV (Schedule Variance), CV (Cost Variance), SPI (Schedule Performance Index), CPI (Cost Performance Index), EAS (Estimated At Schedule) and ETS (Estimated Temporary Schedule). By using this method in the Sports Facilities Construction Project, Kecamatan Kedewan, Kabupaten Bojonegoro, the ACWP (Actual Cost of Work Performed), BCWP (Budgeted Cost of Work Performed), and BCWS (Budgeted Cost of Scheduled) values were obtained. The CV value obtained <0 in weeks 1 to 7 indicates that the costs incurred were greater than the plan, but in weeks 8 to 15 the CV value >0 means that in that week the costs incurred were less than the plan. Meanwhile, meaning the project is experiencing a delay from plan. The estimated of the completion budget requirement obtained from the ETC (Estimate to Compile) value is Rp. 3,345,105,521.28, while the estimated final total project cost obtained from the EAC (Estimate at Complete) value is Rp. 5,680,868,593.22.
TIME AND COST ANALYSIS ON PROCUREMENT OF SUTET 275 Kv 2CCT QUADRUPLE ZEBRA GUMAWANG – GITET LAMPUNG 1 USING TIME COST TRADE OFF METHOD Ijaz Adam; Budi Witjaksana; Hanie Teki TJendani
INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, ENGINEERING, AND INFORMATION SYSTEM Vol. 3 No. 1 (2024): FEBRUARY
Publisher : Transpublika Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55047/ijateis.v3i1.992

Abstract

Indonesia as an archipelago state is still need an equality development with the intention in achieving the goals to fulfill the requirement of structure and infrastructure. The economy that has experiencing growth, it can be seen with the rising of the demand for supply of electricity power whether it is coming from domestic moreover from industrial usages. Lampung Province, as one of the regions which is in a continuation to develop, requires the support of electric power, which at its peak load reaches 1200 MW, while the capacity of the existing power plant can only produce 700 MW, therefore the construction of a 275 kV Gumawang-Lampung 1 SUTET interconnection network with a capacity of up to 2000 MW was established to meet these requirements. Based on the time schedule which noted that the duration of foundation work started with the excavation, concreting until the reaches of it's curing time in 28 days is 42 days in 2023 December 13th is on try to speed up can be curing in 2023 December 8th, so the schedule tower installation in 2023 December 9th will be on time. Due to this delay, the researcher intends to carry out an acceleration analysis starting with preparing a network diagram using the Microsoft Project software, followed by the crashing process by adding groups of workers and tools of any activities on the critical path. The next step is to calculate the crash cost and cost slope values using the time cost trade off (TCTO) method.