Lutfi Marantica
Swadaya Gunung Jati University

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Mixed-Methods Assessment of Schedule Performance: S-Curve Deviation and Delay Factors in a Warehouse Project Kikit Wulandari; Lutfi Marantica
Jurnal Civil Engineering Study Vol. 6 No. 02 (2026): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v6i02.2064

Abstract

Schedule delays in industrial construction raise costs and weaken contractor credibility. S-curve monitoring shows when and by how much a project departs from plan, but not why. This study assesses the schedule performance of a production warehouse project using a convergent mixed-methods design that links weekly S-curve deviation to stakeholders’ accounts of delay factors; delay means observed slippage (negative cumulative deviation from plan). Data comprised the 40-week S-curve, a 32-item Likert questionnaire (35 respondents) and interviews with seven informants, integrated in a joint display. The project led its plan by +4.10% in Week 22, turned negative in Week 26, peaked at -7.69% in Week 31 and stayed behind schedule for 15 weeks until contract end. Interviews identified steel erection as the work most affected. The highest-rated factors were communication barriers (M9, 4.43), extreme weather (E1, 4.43), insufficient labour (T4, 4.40) and no alternative bad-weather plan (E2, 4.40). Interviews added what the survey could not: all informants named delayed steel deliveries as a main reason for the deviation although this item ranked 32nd, and corrective action began only after deviations became critical. The findings suggest interacting factors and reactive schedule control; they are explanatory and case-specific, not statistical causality.