Dr. (C). Ir. Fathurrahman S.T., M.T., IPM., ASEAN Eng
Universitas Islam Kalimantan Muhammad Arsyad Al-Banjari, Banjarmasin, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Twenty Year Life Cycle Cost Assessment of the Banjarbaru City Observation Tower Building for Long-Term Asset Management Aliya Ananda; Dr.Ruliana febrianty ST.,MT M.Hum; Dr. (C). Ir. Fathurrahman S.T., M.T., IPM., ASEAN Eng; Ir. Tezar Aulia Rachman, ST., MT; Dr.(c) Muhammad Gunawan Perdana, ST., MT., IPM.
Jurnal Civil Engineering Study Vol. 6 No. 02 (2026): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v6i02.2216

Abstract

This study analyzes the life cycle cost (LCC) of the Banjarbaru City Observation Tower Building, South Kalimantan, over a 20-year analysis period. The method used was quantitative descriptive analysis based on the Cost Budget Plan (RAB), field observations, and interviews with relevant parties. The cost components analyzed included initial cost, operational cost, routine maintenance cost, and building component replacement cost. The results show that the total LCC for 2025–2045 was Rp2,648,062,764.49, consisting of an initial cost of Rp835,005,747.33 (31.53%), operational costs of Rp694,793,400.00 (26.24%), routine maintenance costs of Rp365,729,904.00 (13.81%), and component replacement costs of Rp752,533,713.16 (28.42%). Accumulated post-construction costs reached Rp1,813,057,017.16 or 68.47% of total LCC. The cost pattern shows spikes in years when components are replaced, particularly in 2040. Therefore, long-term cost planning is required to maintain the optimal function and performance of the observation tower throughout its service life.