Analisis Pembengkakan Biaya pada Proyek Asrama Minhajul Abidin di Barabai Ghina Nafisa; Ruliana Febrianty; Muhammad Gunawan Perdana
Jurnal Civil Engineering Study Vol. 6 No. 02 (2026): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRACT Deviations between initial estimates and final expenditures remain a recurring challenge in building projects. This study quantifies the magnitude of these deviations and their distribution across work categories in the Minhajul Abidin Islamic Boarding School dormitory construction project in Barabai, Indonesia. A descriptive quantitative design was applied to documentary data comprising the Engineer Estimate (EE)/Cost Budget Plan (RAB), initial contract, monthly progress reports, Contract Change Order, Addendum I, and Mutual Check 100% (MC-100). Eight work categories were harmonized and evaluated using cost variance (CV = actual cost - budgeted cost) and the cost overrun percentage. The official total EE was IDR 1,618,544,235.98, while the total MC-100 was IDR 1,622,516,756.76, resulting in an overrun of IDR 3,972,520.78 or 0.25%. Preliminary works had the highest proportional overrun (54.26%), while foundation and reinforced concrete works generated the largest nominal variance (IDR 100,536,950.84; 13.51%). The other five work categories recorded cost savings that offset most of these increases. The project-level deviation was relatively small, but monitoring by work category remains important because aggregate totals can mask substantial internal reallocations.