Azura Alfisyahr
Industrial Engineering, Faculty of Engineering, Widyatama University, Bandung, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Integrating Reliability Analysis and Reliability-Centered Maintenance for Component-Level Preventive Maintenance Planning of a Stretch Forming Machine Tiaradia Ihsan; Rendiyatna Ferdian; Azura Alfisyahr
Industrial and Domestic Waste Management Volume 6 - Issue 2 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/idwm.v6i2.1460

Abstract

Preventive maintenance of stretch forming equipment is commonly scheduled at the machine level, although individual components may exhibit different failure characteristics and reliability patterns. This study evaluates the reliability of critical components of a Cyril Bath Stretch Forming Machine and develops component-specific preventive maintenance recommendations by integrating reliability analysis with Reliability-Centered Maintenance (RCM). Historical maintenance records from 2022 to 2025 were analyzed using Pareto analysis, Failure Mode and Effects Analysis (FMEA), Logic Tree Analysis (LTA), probability distribution analysis, and RCM. Pareto analysis identified nine critical components responsible for 82.60% of total machine downtime, and 36 failure modes were evaluated. The exponential distribution exhibited the highest Index of Fit for components with repeated failure observations, yielding recommended preventive maintenance intervals of 41 days for the Clamping Jaws, 152 days for the Tension Cylinder, and 235 days for the Far Curve. Six components with only one recorded failure were assessed separately using an operating-time-based approach, resulting in a provisional maintenance interval of 591 days. The RCM analysis classified the 36 failure modes into Condition-Directed (66.67%), Time-Directed (27.78%), and Failure-Finding (5.56%) maintenance tasks, with no failure modes assigned to Run-to-Failure tasks. By integrating reliability analysis with RCM, this study establishes component-specific maintenance intervals and task selection criteria, providing a more systematic and differentiated approach to preventive maintenance planning while supporting operational reliability, resource efficiency, and sustainable manufacturing practices.