p-Index From 2021 - 2026
0.408
P-Index
This Author published in this journals
All Journal Astonjadro
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Drainage Planning for the Bojong Gede Underpass Muhammad Yuzar Farhan; Feril Hariati; Muhammad Hasan Wicaksono
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.22143

Abstract

Underpasses are commonly used to reduce congestion caused by level crossings, but their position below ground elevation creates a significant risk of water accumulation, making drainage planning a critical component. This study presents the drainage system design for an underpass located approximately 675 meters from Bojong Gede Station toward Jakarta. The design flood discharge was calculated based on SNI 2415:2016, including the determination of design rainfall, rainfall intensity, composite runoff coefficient, and peak discharge estimation. With a catchment area of 30,000 m², a composite runoff coefficient, and a 2-year design rainfall of 126.3 mm, the resulting design flood discharge is 0.792 m³/s. The drainage system utilizes a sump pit and pumps. Analysis shows that the sump pit would reach full capacity in approximately two hours without pumping, requiring six pumps with a capacity of 135 L/s per unit to ensure the underpass remains operational without flooding. This design can serve as a reference for similar underpass drainage planning in urban areas with comparable flood risk.
Analysis of the Performance Effectiveness of Pedestrian Overpasses (JPO) on Pajajaran Street, Bogor City Astry Ayu Noveby; Syaiful Syaiful; Muhammad Hasan Wicaksono
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.24963

Abstract

The Pedestrian Overpass (JPO) is a vital infrastructure that plays an important role in separating pedestrian flows from vehicular traffic flows to minimize the risk of accidents. Jalan Pajajaran in Bogor City is a main corridor with high traffic volume, where JPO facilities are available but the phenomenon of at-grade street crossing is still frequently encountered. This study aims to analyze the effectiveness of JPO performance based on the real utilization rate in the field and evaluate the perception of comfort and safety from the user's perspective. The method used is descriptive quantitative through pedestrian crossing volume surveys (traffic counting) conducted for 6 days (4 weekdays and 2 weekends) in March 2026 and distributing questionnaires to 100 respondents. The analysis results show that the average JPO utilization effectiveness only reaches 30.07%, while 69.93% of pedestrians choose to cross directly on the roadway. Based on traffic management criteria, the performance of this JPO is classified as Ineffective (less than 40%). Nonetheless, the descriptive analysis of user perception using the Likert Scale produced an average index value of 3.925 (Agree/Positive category), with the highest score on the aspect of safety from traffic conflicts (4.35). The geometric evaluation results indicate that the physical structure of the JPO has met the technical specifications of the Directorate General of Bina Marga (2018). The low effectiveness is more influenced by user behavior factors that avoid the vertical distance of the stairs and the placement of locations that are less integrated with the centers of public activity generation.