Welding of steel structure components in pedestrian bridge (JPO) elements of high-rise buildings is a critical operation that determines structural integrity and user safety. Weld joint failures may reduce load-bearing capacity by 25–40%, making a comprehensive quality control system essential. Empirical studies specifically examining welding quality control for high-rise building JPO structures based on AWS D1.1:2025 and project management perspectives remain scarce in Indonesia; no published study has yet integrated technical, managerial, and human resource factors in a single quantitative model. This study aims to: (1) identify the actual implementation of welding quality control based on AWS D1.1:2025; (2) analyze factors affecting welding output quality; (3) identify dominant variables; and (4) formulate improvement recommendations. A descriptive-associative quantitative method was applied with 35 respondents — welders, Quality Control Inspectors, Welding Inspectors, Site Engineers, Field Supervisors, and Supervision Consultants — at the PMJ Land Tower Building project, East Jakarta (2024–2025). Data were collected via a 5-point Likert scale questionnaire covering 23 independent variables (X1–X23) across four dimensions: technical aspects, human resources, management & supervision, and work environment. Analysis used SPSS 26, including validity testing (Pearson, r-table = 0.334), reliability (Cronbach’s α = 0.892), normality (Kolmogorov–Smirnov), descriptive statistics, rank score analysis, and Pearson correlation. Variable mean scores ranged from 3.89 to 4.26 (Good to Very Good). The three dominant variables were Technical Training (X12, mean = 4.26), Welder Certification (X3, mean = 4.17), and WPS & PQR (X2, mean = 4.14). Work Environment (X5) and VT Effectiveness (X16) scored lowest (mean = 3.89). Correlation testing yielded r = 0.086 (p = 0.622 > 0.05), interpreted through a compliance gap — a discrepancy between positive respondent perceptions and actual field implementation. The study recommends enhancing RKS specifications, improving NDT consistency through an Inspection and Test Plan (ITP), strengthening welder qualification systems, and implementing digital documentation for improved traceability.