This Author published in this journals
All Journal Astonjadro
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Development Analysis Rural Drinking Water Supply System Network in Tulamben Village, Karangasem District I Gusti Ngurah Kerta Arsana; I Putu Gustave Suryantara Pariartha; Sagung Putri Chandra Astiti; I Wayan Suryantara
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23949

Abstract

PAMDES Tirta Gunung Agung utilizes a well with a discharge of 2.53 liters/second as a source of raw water which has served 323 SR (house connections). This research is to analyze efforts to develop SPAMDes to increase services for 130 SRs that do not have water service. A simulation was carried out using Epanet 2.2 software by using Telagawaja SPAM raw water of 1.0 liters/second to increase the shortage of discharge from existing water sources. Simulations that meet the technical criteria are analyzed financially using the parameters Net Present Value (NPV), Internal Rate of Return (IRR) and Benefit Cost Ratio (BCR). Of the 3 (three) development alternatives, only 2 (two) alternatives meet the technical aspects, including: Alternative 2, namely taking raw water discharge from the RD (Distribution Reservoir) Kubu SPAM Telagawaja to Reservoir 1 by gravity via a 2,448 m long pipe with a construction cost of IDR 817. 154,000 have (NPV = Rp. 68,196,373) > 0, (IRR = 6.956%) > MMRA (6%), (BCR = 1.04) > 1, and Alternative 3 is taking raw water discharge from RD Kubu SPAM Telagawaja to the Reservoir 2 through a 1770 m long pipe assisted by a booster pump with construction costs of IDR 693,338,000 having (NPV = IDR 228,880,999) > 0, (IRR = 9.594%) > MMRA (6%) and (BCR = 1.16) > 1. Utilization of raw water from existing wells and additional water discharge from Telagawaja SPAM of 1.0 liters/second can meet water needs in the PAMDES development plan area, as well as planning alternatives 2 and 3 are technically and financially feasible.