Pengendalian Progres Biaya dan Waktu dengan Metode Earned Value Analysis Proyek Gedung Virginia Silitonga; Via Azizul Saputri Khalifah; Muhammad Hamzah Fansuri
Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID) Vol 4 No 2 (2025)
Publisher : Teknik Sipil, Politeknik Negeri Ketapangg

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/rigid.v4i2.1877

Abstract

Proper planning for a construction project is a vital thing that supports the success of the project. Success in a construction project can be seen from the timeliness and costs that have been determined and planned. During the construction implementation process, delays often occur resulting in temporary stops in a construction project. Therefore, control is needed to overcome deviations that occur, one of which is through the Earned Value Analysis method. The aim of this research is to control the project and identify performance, cost and time indicators in more detail through in-depth analysis. Research on this multi-storey building project occurred under budget in the 1st week to the 37th week because CPI > 1 and over budget occurred in the 38th to 44th week because the CPI < 1. Meanwhile, in the 18th week to the 37th week there was a project delay because the SPI < 1. Based on estimates, there will be an additional cost of 12.80% and an additional time of 4 days. Therefore, there is a need for a solution to overcome time delays or reduce cost overruns.
Analisis Produktivitas Pekerjaan Pemasangan Dinding Bata Ringan pada Pembangunan Rumah Sakit dengan Metode Work Sampling Bimo Rizky Aditya; Muhammad Hamzah Fansuri; Fadhil Muhammad Nuryanto
Journal of Research and Inovation in Civil Engineering as Applied Science (RIGID) Vol 4 No 2 (2025)
Publisher : Teknik Sipil, Politeknik Negeri Ketapangg

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58466/rigid.v4i2.1890

Abstract

Analyzing labor productivity in construction work is very important as it greatly affects the completion time of construction projects. One of the labor-intensive jobs is the construction of lightweight brick walls. Therefore, productivity analysis is necessary for this job. This study was conducted to measure the productivity value and work utilization rate (LUR) in the National Brain Center Hospital construction project in Jakarta. A sampling method was used with on-site observation over a period of one week. The analysis showed that the average productivity value of workers constructing lightweight brick walls was 9,623 m²/day. The labor utilization rate (LUR) analysis in the construction of lightweight brick walls resulted in a value of 65%, which is higher than 50%, indicating that the construction of lightweight brick walls in this project was effective.