Analysis of the Impact of Traffic on the Construction of the Jl. Underpass. Gatot Subroto, Medan City Ariful Fikri Efendi Panggabean; Marwan Lubis; Ronal H T Simbolon
QISTINA: Jurnal Multidisiplin Indonesia Vol. 3 No. 2 (2024): December 2024
Publisher : CV. Rayyan Dwi Bharata

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57235/qistina.v3i2.4242

Abstract

Medan City, as the capital of North Sumatra Province, is facing severe traffic jams at the Jalan Gatot Subroto-Jalan Gagak Hitam intersection due to the rapid growth of vehicles. To overcome this problem, the Medan City Government plans to build an underpass to separate traffic flows and increase road capacity. This research aims to analyze the impact of traffic during the construction phase, by grouping vehicles into motorbikes, light vehicles and heavy vehicles, which are then converted into passenger cars (SMP). Research shows that the existing traffic volume is 2813.8 pcu/hour towards Jalan Ringroad and 2620.5 pcu/hour towards Jalan Asrama, which exceeds the road capacity. During the construction phase, traffic volume dropped significantly to 637.6 pcu/hour and 635.5 pcu/hour, which shows more stable traffic flow. construction of underpasses can effectively reduce future congestion, but careful planning is required to minimize negative impacts during the construction period. It is hoped that these results can provide important input in transportation planning in Medan City.
Analysis of the Implementation of Traffic Management at the Johor Roundabout Jalan Karya Wisata-Medan Johor Dennis Bimantara; Marwan Lubis; Bangun Pasaribu
QISTINA: Jurnal Multidisiplin Indonesia Vol. 3 No. 2 (2024): December 2024
Publisher : CV. Rayyan Dwi Bharata

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.57235/qistina.v3i2.4243

Abstract

Johor Roundabout is located on Jalan Karyawisata kec, Medan Johor, or more precisely right in front of the entrance to the J-City complex. This roundabout was just built in the 12th month of 2023. The existence of this roundabout has a detrimental impact on the speed of vehicles passing through the roundabout. The aim of this thesis is to analyze the performance of roundabouts using the MKJI1997 method. This survey was carried out by conducting research for 7 days, where each day I conducted a survey for 12 hours, namely from 07:00 to 19:00. After carrying out the survey, it was also found that the peak hour occurred on Monday at 17:00-18:00 where it was obtained that the total inflow was 7854 PCU/hour with the composition of Light Vehicles (LV) 3127 Pc/hour, Heavy Vehicles (HV) 322 PCU/hour and , motorbike (MC) 2189Smp/hour, and the results also obtained for the degree of saturation, namely 1.094, which means that the level of service for the roundabout is at F (i.e. traffic flow conditions are relatively low).