Endang Haryani
Universitas Kristen Satya Wacana, Salatiga, Indonesia

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

Model Scrum pada Rekacipta Sistem Informasi Manajemen Program Kerja dan Anggaran di Pusat Pengembangan Anak Ariya Dwika Cahyono; Endang Haryani
Jurasik (Jurnal Riset Sistem Informasi dan Teknik Informatika) Vol 9, No 2 (2024): Edisi Agustus
Publisher : STIKOM Tunas Bangsa Pematangsiantar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30645/jurasik.v9i2.829

Abstract

This research aims to create a web-based management information system of work program and budget in the Child Development Center (CDC) as a management tool of planning and controlling. This research was conducted due to problems caused by manual management with spreadsheets and desktop-based applications, as well as manual and separate management between planning and realization. The development of this web-based application applies the Scrum model, which consists of 7 sprints. This Scrum model has organized system development in detail and according to user needs. After completing the research stages, this system was successfully developed. This application can facilitate adminitrators of work program and budget to work effectively and efficiently. Adminitrators can work anywhere and anytime. The automation process in the system guarantees the accuracy of calculations and adequate management. Thus, CDC's need for a basic infrastructure, namely management information systems of work program and budget, has been achieved. This system is an important benchmarking for CDCs, since the same procedure applies on all CDCs in Indonesia.
Analisis Manajemen Risiko Pada Aplikasi SAP LOGON 750 di PT. XYZ Berbasis ISO 31000:2018 Marvel Evandi Budiono; Endang Haryani
Jurasik (Jurnal Riset Sistem Informasi dan Teknik Informatika) Vol 9, No 2 (2024): Edisi Agustus
Publisher : STIKOM Tunas Bangsa Pematangsiantar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30645/jurasik.v9i2.834

Abstract

The SAP LOGON 750 handles production process activities from inputting production data, production scheduling, production processes, to reporting production. There are various possible risks that occur, but PT. XYZ has never managed risks internally. This study aims to analyze risk management for the use of the SAP application. This research focuses on one case study object and applies a qualitative approach based on the ISO 31000: 2018 framework. The results found 18 possible risks. There are 12 medium level risks, among others are dust/dirt, server down, lightning, power outage, lost network connection, dead web service, hardware damage, human error, data theft, fire, earthquake, hacker attack. While there are 6 low level risks, namely backup failure, data corruption, overheat, overload, flooding and virus attacks. Therefore, this study concludes that there are no risks that are very dangerous or have a loss impact on companies related to the use of the SAP LOGON 750 application. Although there are medium-level risks, these can be overcome by technical and systematic risk treatment. Technical risk treatment includes reviewing ventilation and electrical structures, installing lightning rods, providing fire extinguishers, generators and UPS. While systematic risk treatment through periodic maintenance, among others, for servers, web services, networks, hardware and data backups. In addition, there is socialization and training for employees. PT XYZ is expected to always be vigilant and prepared by managing risks and risk treatment properly
Penerapan ISO 31000:2018 untuk Analisis Manajemen Risiko pada Sistem Informasi Smart Operation di PT. XYZ J Jericho; Endang Haryani
Jurasik (Jurnal Riset Sistem Informasi dan Teknik Informatika) Vol 9, No 2 (2024): Edisi Agustus
Publisher : STIKOM Tunas Bangsa Pematangsiantar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30645/jurasik.v9i2.826

Abstract

This study objectives to analyze risk management on the Information System of Smart Operation at PT. XYZ, through identifying risks, describing the impact of these risks, and recommending risk treatment. This system manages sales transactions, from sales orders to financial reporting. This study is driven by the importance of information technology investment to improve a company’s efficiency. However, this investment has uncertainties about the values that can be attained and the risks that may occur. The research applied a qualitative method and ISO 31000:2018 as the referred framework. The analysis identified 12 risks in the 5 sectors. The research found that there is no high-level risk, 8 medium-level risks and 4 low-level risks. Based on these findings, the study concludes that related to the implementation of the information system, there are no risks that endanger and harm the company. Based on the risk impact, the recommended risk treatment is to mitigate or reduce risks. There are 4 medium risks that have the greatest score of 6, among others are order recording errors, number of goods decrease, accidental loss of goods/theft, and wrong goods selection. Actions to reduce the risk are regular log checking, training on the use of applications, regular stock-opname, placing goods within CCTV range and rechecking documents with goods sent. Meanwhile, the risk of counterfeit money has the least score of 1, because the company has an accurate detection device