Aprita Handini
Civil Engineering Department, Politeknik Negeri Jakarta

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analysis of the Influence of Material Procurement Supply Chain Management on Project Time Performance Aprita Handini; Afrizal Nursin
Potensi: Jurnal Sipil Politeknik Vol. 28 No. 2 (2026): Potensi: Jurnal Sipil Politeknik
Publisher : Department of Civil Engineering, Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35313/potensi.v28i2.4403

Abstract

Construction process often faces material-related issues. Materials really need special attention because the use of materials takes up 50% - 70% of the total cost of the whole project. Therefore, very good management is needed. Supply chain management is used to manage material procurement because it has a concept that is able to increase project success by producing products on time, reducing costs, and managing the industry effectively and efficiently. This study aims to find out the dominant factors that influence the implementation of material procurement supply chain management and the effect of material procurement supply chain management on construction project time performance. In this study three factors influenced the implementation of supply chain management of material procurement including financial flow, information flow, and material flow. This study uses a questionnaire as a data collection method, then analyzed with validity test, reliability test, classical assumption test, and verification test with the help of SPSS software. The results of this study indicate that the material flow (0.873) has a significant effect on the time performance of construction projects, and the biggest indicator is in the suitability of the material with technical specifications with a value of 4.14.