Futuh Al Faroq
Civil Engineering Department, Politeknik Negeri Bandung

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Substructure Optimization and Bored Pile Group Performance of Cihanjuang Bridge on Steep Volcanic Slopes Dr. Dewi Amalia, ST., MT.; Futuh Al Faroq; Naufal Prambudika; Hendry Hendry; Agus Suyono; Apip Pudin; Paul Yohanna
Potensi: Jurnal Sipil Politeknik Vol. 28 No. 2 (2026): Potensi: Jurnal Sipil Politeknik
Publisher : Department of Civil Engineering, Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35313/potensi.v28i2.6578

Abstract

West Bandung Regency is focusing on infrastructure development, especially in mountainous areas like Parongpong, which struggles with steep terrain and uneven growth. The valley between Parongpong and Cisarua leads to traffic congestion and inconsistent land values. Surveys reveal untapped ecotourism potential in the area. A 200-metre-long, 10-metre-wide connecting bridge is planned between Cisarua KM 4+800 and Parongpong KM 5+500 at an elevation of 950 metres. Due to the landslide-prone zone, the project emphasizes the design of the bridge's foundation and piers. A1 measures 6 metres in height, 12 metres in width, and 14 metres in depth, with 10 bored piles for improved load capacity, shear, and overturning stability. A2 is 5 metres high, 12 metres wide, and 14 metres deep, with 8 bored piles providing similar stability. P1 and P2 are designed at 25 metres in height with 12 bored piles as deep foundations. The sub-structure, with a safety factor of 1.3, has sufficient stability against the loads. Increasing pile diameter enhances group capacity, while optimal pile spacing prevents stress interference and ensures better load distribution and efficiency.