Claim Missing Document
Check
Articles

Found 1 Documents
Search

Optimalisasi Tata Letak Fasilitas dan Material Handling Berbasis Lean Manufacturing Ady Rayyan
Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika Vol. 4 No. 4 (2026): Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika.
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/jupiter.v4i4.1709

Abstract

The increase in production targets at NISHITANI Co. Ltd. from 4,500 to 5,700 units per shift demanded a smooth material flow. Initial conditions showed random Work-in-Process (WIP) placement triggering motion waste and transportation delays of 38 seconds per cycle. This study aimed to optimize facility layout and material handling using a Lean Manufacturing approach to reduce transfer time and meet capacity targets. The method combined route mapping using Spaghetti Diagrams, time studies, and computational simulation (JaamSim) to validate interventions. The layout implementation consolidated WIP areas, transforming a zigzag path into a straight-line flow. The results showed a decrease in material travel distance from 38 meters to 10 meters, and a reduction in transportation time from 38 seconds to 10 seconds per cycle. The use of batching transport trolleys was implemented to reduce the frequency of manual transfer. This layout and material handling intervention was able to consistently meet the target production flow rate.