Dimas Wisnu Haryoko
Master of Civil Engineering Program, Faculty of Engineering, Universitas 17 Agustus 1945 Surabaya

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Examination of Operational Strategy and Economic Viability of Bus Rapid Transit (BRT) Along the Porong - Pasuruan Route Through Four Step Model Analysis Dimas Wisnu Haryoko; Budi Witjaksana; Hanie Teki Tjendani
Formosa Journal of Science and Technology Vol. 5 No. 7 (2026): July 2026
Publisher : PT FORMOSA CENDEKIA GLOBAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55927/fjst.v5i7.104

Abstract

The continued increase in the number of motorized vehicles each year, at a growth rate of approximately 4.6%, is a strong indication that the public's mobility needs are not being met by adequate public transportation services. The purpose of this study is to develop an optimal Bus Rapid Transit (BRT) operational plan for the Porong-Pasuruan corridor and to analyze the financial feasibility of implementing it. The BRT service operates from 5:00 AM to 9:00 PM (16 hours). The total route length is 33.4 kilometers per hour. The planned operating speed is 30 kilometers per hour, resulting in a travel time of 66.8 minutes. The round-trip travel time is 143.6 minutes. The vehicle headway is 14.65 minutes. The trip frequency is 4.1 vehicles per hour. The cycle time from A to B and back to A is 153.62 minutes. The number of trips per vehicle is 6 trips, and the fleet requirement is 10 vehicles. The benefit-cost ratio (BCR) calculation yields a value of 1.10. A BCR value > 1 means that the Porong-Pasuruan corridor Bus Rapid Transit (BRT) implementation project is declared feasible because the total benefits are greater than the costs incurred