Technical Factor Analysis that Impacts Building Maintenance in the Retention Phase Achmad Nur Ramadhani; I Nyoman Dita Pahang Putra
Civil and Sustainable Urban Engineering Volume 6 - Issue 1 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i1.947

Abstract

Building maintenance during the retention phase (Defects Liability Period) was a critical stage in construction projects because defects frequently emerged after handover and could cause delays, cost overruns, and disputes between owners and contractors. In Indonesia, although a retention fund mechanism was applied, maintenance performance during this phase often remained suboptimal. This study aimed to identify and quantify the influence of technical factors on building maintenance success in high-rise projects during the retention phase in Surabaya. Data were collected through a structured questionnaire using a five-point Likert scale from 31 project staff members with relevant professional experience, selected using purposive sampling. The analysis was conducted using Partial Least Squares–Structural Equation Modeling (PLS-SEM) to evaluate both the measurement and structural models, supported by supplementary regression analysis. The results showed that technical factors had a strong and significant effect on building maintenance success, with material availability emerging as the most influential technical factor, while schedule planning was the most dominant success criterion. The high R² and effect size values indicated that technical factors played a substantial practical role in determining maintenance performance during the retention phase. These findings highlighted the importance of effective material logistics, systematic maintenance planning, and strict quality control. Overall, the study demonstrated that improved technical management practices significantly enhanced maintenance performance. From a practical perspective, contractors were encouraged to establish stockpiles of essential materials and adopt digital tools for maintenance planning to ensure timely execution, smooth operations, and effective cost control during the retention phase.
Identifying Supply Chain Risks Influencing Contractor Profitability Using Structural Equation Modeling Fikri Arief Ananda; I Nyoman Dita Pahang Putra
Civil and Sustainable Urban Engineering Volume 6 - Issue 1 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i1.948

Abstract

The construction supply chain involved complex interactions among stakeholders and was exposed to various risks that could affect contractor profitability. However, existing studies had rarely integrated Structural Equation Modeling (SEM) and the Relative Importance Index (RII) to simultaneously capture both statistical relationships and practitioners’ perceptions, particularly in the context of high-rise building projects in Indonesia. This study aimed to identify and analyze supply chain risks in the flows of information, materials, and funds and to examine their influence on contractor profitability. Data were obtained from structured questionnaires distributed to 50 respondents across five high-rise projects in Surabaya. The data were analyzed using Partial Least Squares Structural Equation Modeling (PLS-SEM) alongside RII. The SEM results revealed that all three flows, information, materials, and finances, significantly improved contractor profitability, with information flow having the strongest effect. The RII rankings indicated that information risks were the primary concern, particularly unclear communication and errors in conveying project scopes. Comparing the statistical significance identified by SEM with the practical perceptions captured by RII revealed key gaps between measured impacts and practitioners’ views, thereby improving risk prioritization. Overall, this study advanced construction supply chain risk research by integrating SEM and RII methods, while providing practitioners with actionable recommendations to improve information sharing, streamline material handling, and strengthen financial management to enhance profitability.