Rendi Wili Wijaksono
Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Elephant Modular Chair Factory Layout: Layout Pabrik Kursi Modular Gajah Akbar El Sapta; Aji Damar Pamungkas; Mochammad Gilang Romadlon; Rendi Wili Wijaksono; Bilqis Sabrina Anggrayni; Athika Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/shjb5g59

Abstract

General Background: Facility layout optimization represents a critical operational requirement for modern manufacturing industries aiming to streamline material flow and minimize unnecessary internal movements. Specific Background: Manufacturing facilities frequently encounter inefficient departmental proximities and long material transfer distances that hinder overall productivity and inflate operational expenditures. Knowledge Gap: Traditional initial factory arrangements often fail to integrate comprehensive qualitative relationship evaluations with quantitative movement and machine requirement analyses, leading to sub-optimal workflow configurations. Aims: This study evaluates and redesigns the production facility layout of the Gajah Modular Chair factory to optimize material movement efficiency and minimize internal transfer costs. Results: Utilizing the Multi-Product Process Chart (MPPC), Activity Relationship Chart (ARC), From To Chart, and Blocplan methods, the proposed layout successfully achieves superior departmental proximity and shorter transfer distances compared to the initial configuration, culminating in an optimized layout with an adjusted score of 0.93. Novelty: This research establishes a hybrid analytical framework integrating MPPC, ARC, and Blocplan algorithms specifically tailored for modular wooden furniture assembly lines. Implications: Implementing the redesigned layout configuration enables industrial managers to significantly enhance production throughput, eliminate back-tracking delays, and reduce material handling expenses. Key Findings Highlights Integration of MPPC, ARC, and From To Chart methodologies successfully identifies structural bottlenecks and excessive material transfer distances in the initial factory layout. Blocplan alternative generation yields ten distinct layout configurations, identifying layout alternative number two as the optimal design with an adjusted score of 0.93. The proposed facility redesign significantly improves interdepartmental proximity and streamlines material handling operations to elevate overall manufacturing productivity. Keywords Facility Layout, Material Handling, Arc, From To Chart, Blocplan