Muhammad Aflah Afriadi
Program Studi Teknik Industri, Fakultas Sains dan Teknologi, Universitas Muhammadiyah Sidoarjo

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Spongebob Modular Chair Factory Layout: Layout Pabrik Kursi Modular Spongebob Naufal Althof Dzulfaqor; Muhammad Aflah Afriadi; Moch Naufan Irwanto; Moch Ardi Anggara Sari; Atikha Sidhi Cahyana
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/9xtxvx59

Abstract

General Background: Facility layout planning represents a vital operational element that directly determines manufacturing efficiency and resource utilization within industrial systems. Specific Background: This study analyzes the application of facility layout planning in the production process of the Spongebob Modular Chair to optimize material flow and reduce material handling costs. Knowledge Gap: Inefficient departmental arrangements frequently cause excessive material handling movement and extended production times that hinder overall operational performance. Aims: This research aims to identify inter-departmental relationships through Activity Relationship Chart and Activity Relationship Diagram, analyze material flow using From-To Chart, and develop layouts with BlocPlan software. Results: The quantitative evaluation reveals a total handling distance of 42.92 meters and total handling costs of Rp2,827,824, with the optimal layout achieving an Adjusted Score of 0.81. Novelty: This work integrates qualitative relationship charts with algorithmic BlocPlan spatial modeling to redesign modular furniture manufacturing facilities. Implications: The proposed layout smooths production flow, minimizes unnecessary movements, and enhances operational efficiency and flexibility. Key Findings Highlights The integration of Activity Relationship Chart and From-To Chart successfully identifies system inefficiencies and department proximity requirements. BlocPlan software evaluates alternative configurations, selecting an optimal layout with an Adjusted Score of 0.81. The proposed facility layout successfully achieves a total handling distance of 42.92 meters and reduces overall production waste. Keywords Facility layout planning, Material handling, Arc, Blocplan, Modular furniture