Claim Missing Document
Check
Articles

Found 4 Documents
Search

SUPPLIER GOVERNANCE AND OPERATIONS PERFORMANCE IN AN INDONESIAN FOOD AND BEVERAGE (F&B) SUPPLY CHAIN Ahmad Syamil
International Journal of Economic, Business, Accounting, Agriculture Management and Sharia Administration (IJEBAS) Vol. 5 No. 6 (2025): December
Publisher : CV. Radja Publika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Food and beverage (F&B) supply chains depend on suppliers that can meet production requirements consistently. This study examines how supplier selection, involvement, development, and monitoring relate to perceived operations performance in one Indonesian firm. A cross-sectional survey used convenience sampling and a five-point response format. Of 200 questionnaires distributed to managers, procurement personnel, and supplier representatives, 185 were usable, giving a usable return rate of 92.5%. The analysis draws on available aggregate descriptive statistics, internal consistency estimates, and Pearson correlations. Using a 1-to-5 Likert scale survey, monitoring received the highest practice score (mean = 4.25, standard deviation = 0.71), followed by selection (4.12, 0.85), development (4.05, 0.78), and involvement (3.89, 0.92). The respective correlations with perceived operations performance were 0.745, 0.510, 0.680, and 0.625. Monitoring was therefore prominent in both the practice profile and the association profile. However, the coefficients do not establish its independent contribution or show that additional monitoring improves performance. The study offers an exploratory comparison of supplier governance practices within a single supply chain setting. Its managerial implication is to connect performance checks with supplier problem solving and targeted capability development, while evaluating changes through quality, delivery, and cost records. Broader conclusions require stronger measurement documentation, matched buyer and supplier evidence, and observations over time.
EXAMINING SERVICE QUALITY GAPS AND OPERATIONS–SUPPLY CHAIN PERFORMANCE IN THE INDONESIAN AUTOMOTIVE PARTS INDUSTRY Ahmad Syamil; Widodo Samyono
International Journal of Social Science, Educational, Economics, Agriculture Research and Technology (IJSET) Vol. 4 No. 12 (2025): NOVEMBER
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Automotive-parts customers experience supply-chain performance through delivery reliability, timely information, and effective problem resolution. This article develops a diagnostic framework that connects adapted SERVQUAL gaps with operational indicators guided by the APICS/ASCM Supply Chain Operations Reference (SCOR) model. A dataset contains 96 records across 24 Indonesian firms. Five service dimensions are assessed using perception minus expectation scores. Paired comparisons and correlations demonstrate the proposed analysis. Reliability has the largest illustrated gap (−0.96), followed by responsiveness (−0.77). The overall gap correlates positively with the operational composite (r = .47), on-time-in-full delivery (r = .40), and forecast accuracy (r = .39), and negatively with order-cycle time (r = −.51) and defects (r = −.34). These patterns show how managers could connect customer concerns to process improvement. The contribution is a transparent measurement results that distinguish diagnostic priorities from causal explanations.
Optimizing Operations And Supply Chain Performance: Implementation Of Total Productive Maintenance (TPM) To Reduce Lead Time In An Indonesian Telecommunication Equipment Company Ahmad Syamil
Science and Education Journal (SICEDU) Vol 5 No 3 (2026): Science and Education Journal 2026
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/sicedu.v5i3.1562

Abstract

In the modern era of intense industrial competition, manufacturing organizations must continuously optimize their operations and supply chain performance to meet rapidly changing market demands. Electronic and telecommunication equipment manufacturers invest heavily in automated machinery to maintain high output. However, frequent equipment breakdowns severely inflate production lead times and disrupt downstream supply chain schedules. This study evaluates the implementation of Total Productive Maintenance (TPM) lean tools to reduce machine downtime and total lead time in a leading Indonesian telecommunication equipment manufacturer located in West Java. A structured six-month ground study was conducted on a production line to establish baseline equipment performance, followed by Pareto breakdown analysis, root cause identification, and the execution of autonomous and planned maintenance protocols. The empirical results demonstrate a 78.2% reduction in monthly machine breakdown hours, dropping from a baseline average of 117.6 hours to 25.6 hours per month. This improvement far exceeded the company's initial 40% downtime reduction target, stabilizing line throughput, eliminating workforce idle time, and significantly enhancing overall supply chain responsiveness. The average production lead was estimated to decrease from approximately 14 days before TPM implementation to 9 days after implementation, representing a 35.7% reduction. The findings provide operational managers with a validated blueprint for combining proactive maintenance with lean supply chain strategies in high-tech manufacturing environments.
VALUE STREAM MAPPING FOR OPERATIONS AND SUPPLY CHAIN COORDINATION IN INDONESIAN AUTOMOTIVE MANUFACTURING Ahmad Syamil
Multidiciplinary Output Research For Actual and International Issue (MORFAI) Vol. 5 No. 5 (2025): Multidiciplinary Output Research For Actual and International Issue
Publisher : RADJA PUBLIKA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Operations and supply chain decisions require a consistent view of processing capacity, inventory, and replenishment. This study develops an analytical planning case for an automotive component supplier in West Java, Indonesia. Baseline and proposed value stream maps (VSM) are evaluated using takt time, inventory coverage, ideal capacity, and demand sensitivity. At 360 units per day and 25,920 available seconds, takt time is 72.00 seconds. The proposed design reduces inventory from 3,600 to 1,080 units and processing content from 282 to 230 seconds. The coverage-based lead-time indicator decreases from 10 to 3 working days. Ideal line capacity increases from 316.10 to 446.90 units per day. At demand of 396 units and 90% effective operating time, utilization reaches 98.46%. The analysis connects inventory targets with capacity restrictions and replenishment rules.