Salmon Azman
CV. Lima Pilar Utama Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Komparatif Perkuatan Seismik Kolom Beton Bertulang Menggunakan Metode Konvensional Hingga Sabuk Pasca-Tarik Salmon Azman
Journal of Infrastructure and Construction Technology Vol. 3 No. 2 (2025): July 2025
Publisher : Dept. of Civil Engineering Universitas Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56208/jictech.3.2.11-22

Abstract

This study compares four seismic retrofitting methods for reinforced concrete columns (concrete jacketing, steel jacketing, FRP wrapping, and post-tensioned steel straps, PTSS) using three case studies and supporting literature, covering mechanical performance, construction management, architectural impact, and cost. In frame tests, concrete jacketing raised peak lateral strength by 59.86% and initial  stiffness by 45.9% but lowered ductility by 10.4%; it needed five months and excavation to 4 m, and enlarged 350 × 350 mm columns to 550 × 550 mm. Steel jacketing gave only 7.56% strength and 2.1% stiffness gains (ductility −10.9%) in four months. FRP was fastest (three months) and kept the column geometry, but its material cost may reach 2.3 times that of concrete jacketing. PTSS, an active  confinement, increased ductility by up to 64% and restored the residual strength of high-strength concrete damaged to 50% of its ultimate load; closer strap spacing (10 mm) outperformed additional layers.  Using recycled straps, PTSS is potentially the cheapest option, but field cost data are lacking. Retrofit selection therefore requires a forensic assessment balancing seismic demand, urgency, aesthetics, and  budget.