Faisal Sayuti
Graduate School of Renewable Energy, Darma Persada University, East Jakarta 13450, Indonesia

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Bridging Risk and Finance: Development of a Lifecycle Insurance-Based Framework for Micro-Hydropower Investments Djoko Mulyono; Florida Taty Satyawati; Faisal Sayuti; Andre Yoris Ginting; Erkata Yandri
Grimsa Journal of Business and Economics Studies Vol. 4 No. 1 (2027): January 2027 (In Press)
Publisher : Graha Primera Saintifika

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61975/gjbes.v4i1.145

Abstract

Micro-hydropower investments face interconnected hydrological, technical, operational, and financial risks that may affect project cash flows and debt-service capacity. This study develops a lifecycle insurance-based de-risking framework to integrate project risk assessment, risk-treatment selection, and financing implications. Using a design-oriented conceptual research approach, relevant literature was synthesized through concept extraction, thematic classification, and relationship mapping. The resulting framework combines four project lifecycle stages, two cross-cutting analytical dimensions, and five sequential analytical functions. A hypothetical financial sensitivity analysis illustrates how hydrological stress and parametric insurance arrangements influence the debt service coverage ratio (DSCR). Under the assumed conditions, DSCR decreases from 1.50 to 1.05 following hydrological stress, increases to 1.28 when a qualifying insurance payout is received, and declines to 0.98 when premiums are paid without a corresponding payout. These results demonstrate that insurance may provide contingent financial protection but can worsen debt-service capacity when payout conditions are not satisfied. The study contributes a structured conceptual approach connecting lifecycle risk management with insurance suitability and financing interpretation. Empirical validation using project-specific hydrological, insurance, and financial data remains necessary.