This Author published in this journals
All Journal IKRA-ITH EKONOMIKA
Aine Rahmawati
Program Studi Teknik Logistik, Universitas Pertamina, Jakarta

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analisis Bullwhip Effect untuk Produk Pertalite dan Pertamax dengan Metode Periodic Review (Studi Kasus: PT Pertamina RU IV Cilacap) Yelita Anggiane Iskandar; Aine Rahmawati
IKRAITH-EKONOMIKA Vol. 9 No. 3 (2026): IKRAITH-EKONOMIKA Vol 9 No 3 November 2026
Publisher : Universitas Persada Indonesia YAI

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Kilang Pertamina Internasional - Refinery Unit (RU) IV Cilacap is a refinery that hasprocessed crude oil into BBM (refined fuel oil), non-fuel, and petrochemical products since 1974.Refinery Planning & Optimization (RPO) is one of the functions in the Supply Chain &Distribution section at the refinery. The task of the RPO is to manage, control, and regulate dailyproduction and distribution operations based on STS (production planning), and to maintain andcontrol the company’s supply chain. Pertalite and Pertamax products are produced based on theSTS provided by the Refinery Planning section, in which production constraints in the field andfluctuating STS cause a deviation between plan and realization, so that inventory and productionpolicies are not properly controlled. The purpose of this research is to analyze the existing bullwhipeffect for Pertalite and Pertamax products in 2022 and provide optimal production policies to dealwith the bullwhip effect (BE) that occurs with the periodic review method. The results show thatthe existing BE value is considered not good because most of the values are greater than 1, while the BE value after implementing production policies with the proposed method is known to bebetter. Therefore, we can conclude that it is recommended to apply the periodic review method toovercome the BE. By implementing the production and inventory policy for a BE value < 1 forPertalite products, the amount of safety stock required is 49,42 mb with a base stock level of 129mb, z (service level) 95%, and a lead time of 2,5 days. Meanwhile, for Pertamax products, it isknown that safety stock should be 53,50 mb with a base stock level of 73 mb, z 95%, and a leadtime of 2 days.