ANALISIS MANAJEMEN RISIKO PADA PROYEK PEMBANGUNAN JEMBATAN M, Debbi Rivida; T, Andi Tenrisuki; Salimah, A'isyah
Construction and Material Journal Vol 1, No 2 (2019): Construction and Material Journal Vol. 1 No. 2 Juli 2019
Publisher : Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pekerjaan konstruksi merupakan salah satu pekerjaan yang mempunyai risiko tinggi terutama pada tahap pelaksanaan konstruksi, tidak terkecuali dalam pekerjaan pelaksanaan konstruksi jalan dan jembatan. Risiko dapat memberikan pengaruh terhadap produktivitas, kinerja, kualitas dan biaya dari proyek. Dalam mengatasi risiko dibutuhkan manajemen risiko. Manajemen risiko merupakan proses pengukuran atau penilaian risiko serta pengembangan strategi pengelolaannya. Tujuan penelitian ini adalah dilakukan identifikasi risiko, analisis risiko dan respon risiko pada pelaksanaan proyek konstruksi jembatan. Berdasarkan identifikasi faktor risiko yang didapat dari studi literatur dan divalidasi oleh pakar diperoleh 69 faktor. Dilanjutkan analisa risiko dengan melakukan uji validitas dan reliabilitas sehingga faktor risiko tereduksi sebanyak 9 faktor dan analisa level risiko untuk mendapatkan risiko dominan, risiko dominan yang diperoleh terdapat 4 faktor dominan yaitu faktor risiko yang paling tinggi dengan bobot 11,657 adalah kondisi lokasi site yang sulit, selanjutnya kesalahan estimasi waktu pelaksanaan proyek dengan bobot 10,886, ketidaktersediaan material dengan bobot 10,657, dan keterlambatan pengiriman material dari suplier dengan bobot 10,400. Dilanjutkan dengan melakukan validasi terhadap pakar pada keempat faktor dominan. Berdasarkan hasil kuesioner tahap ketiga ini seluruh pakar setuju dengan keempat faktor dominan yang mempengaruhi terhadap pelaksanaan konstruksi jembatan.Kata kunci: manajemen risiko, jembatan, risiko dominan
PERENCANAAN PERSEDIAAN MATERIAL DENGAN PEMILIHAN METODE LOT SIZING YANG OPTIMAL PADA BATCHINGPLANT PT. X Akbar, Nuh; Salimah, A'isyah
Construction and Material Journal Vol 2, No 2 (2020): CONSTRUCTION AND MATERIAL JOURNAL VOL. 2 NO. 2 JULI 2020
Publisher : Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract Inventory is one of the asset / investment in a company that can be either raw materials, work in process, and finished goods, the primary function is to ensure the smooth supply of goods demand mechanism according to the needs of customers/consumers. Companies often have problems of inventory, supplies of which the company a shortage of inventory which could disrupt the smooth implementation of production, so that these problems could make the company down. Therefore, inventory planning is needed to obtain minimum inventory costs. Material requirements planning is done using with the Lot sizing, using MRP method that begins with forecasting the master production schedule for the coming period of one year. Based on the pattern of data, forecasting techniques used trend line analysis model and exponential smoothing with trend adjustment model. By finding out the material requirement data, product structure and bill of materials, lead time and inventory costs for materials, we could make a comparison of the cost of inventory planning by using 2 lot sizing techniques, there are fixed order quantity (FOQ) and period order quantity (POQ). This method is applied in PT. X to supply raw materials ready mix concrete, and of the both methods were chosen methods that produce the most optimum cost. Based on the analysis, period order quantity (POQ) technique result the minimum total inventory cost is IDR. 112,705,080.96.Keywords : inventory, forecasting, MRP, lot sizing, optimum inventory costAbstrak Persediaan merupakan salah satu aset/investasi dalam suatu perusahaan yang dapat berupa bahan baku, barang dalam proses, maupun barang jadi, dimana fungsi utama persediaan yaitu menjamin kelancaran mekanisme pemenuhan permintaan barang sesuai dengan kebutuhan pelanggan/konsumen. Perusahaan sering kali mengalami masalah persediaan, diantaranya perusahaan mengalami kekuarangan persediaan yang dapat mengganggu kelancaran pelaksanaan produksi, sehingga masalah ini dapat merugikan perusahaan. Oleh karena itu, diperlukan perencanaan persediaan untuk memperoleh biaya persediaan yang minimum. Perencanaan kebutuhan material dilakukan dengan metode Lot Sizing menggunakan Material Requirements Planning (MRP) yang diawali dengan melakukan peramalan terhadap jadwal induk produksi untuk periode satu tahun yang akan datang. Berdasarkan pola data, teknik peramalannya menggunakan trend line analysis model dan exponential smoothing with trend adjustment model. Dengan mengetahui data kebutuhan material, struktur produk dan bill of material, lead time, serta biaya untuk persediaan material, kemudian dilakukan dengan perbandingan biaya perencanaan persediaan dengan menggunakan 2 teknik lot sizing yaitu fixed order quantity (FOQ) dan period order quantity (POQ). Metode ini diterapkan di PT. X untuk persediaan bahan baku pembentuk ready mix concrete, dan dari kedua metode tersebut dipilih metode yang menghasilkan biaya yang paling optimum. Berdasarkan analisis yang dilakukan, teknik period order quantity (POQ) menghasilkan total biaya persediaan yang minimum yaitu Rp. 112.705.080,96.Kata kunci  : persediaan, peramalan ,MRP, lot sizing, biaya persediaan optimum.