Faktor Keterlambatan Pekerjaan Struktur Gedung terhadap Biaya Pelaksanaan pada Proyek Pembangunan Hotel di Bekasi Putra, Dian Dwi; Paryati, Ninik; Yulius, Elma
BENTANG : Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil Vol 7 No 2 (2019): BENTANG Jurnal Teoritis dan Terapan Bidang Rekayasa Sipil
Publisher : Universitas Islam 45

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (470.731 KB) | DOI: 10.33558/bentang.v7i2.1752

Abstract

Nowadays, delays in project often occur and cause various losses both for service providers and users. For the contractors, delays create the project cost overruns due to project overtime and can decrease contractor credibility in the future. This study aims to analyze a project delay by minimizing the work delays earlier. The analysis of a hotel building planning regarding the cost and time delays is done qualitatively by distributing questionnaires to the contractors and processing the responses using the SPSS software. The results of the S curve analysis and 30 factors that caused the project delay were identified and indicated that there was a delay value of 1.26% with five variables that most contributed to the delay in the construction project at PT. Wijaya Kusuma Contractors, i.e. reworking due to construction errors, low coordination between contractors and stakeholders, late material delivery, and equipment shortages.