STUDI RISIKO DAN BIAYA PADA TAHAP PERENCANAAN PROYEK KONSTRUKSI BANGUNAN INDUSTRI MIGAS (STUDI KASUS: PROYEK X) Mathawi, Mathawi; Johan, Johny
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan Vol 3, No 1 (2019): Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmstkik.v3i1.2813

Abstract

Industri konstruksi untuk bangunan industri khususnya industri MIGAS sangat rentan terhadap risiko ketidakpastian karena sifat bisnisnya dari penilaian investasi awal proyek sampai dengan penyelesaian fisik diakhir proyek. Dan juga sangat rentan terhadap bahaya jika tidak ada langkah langkah yang tepat dan tindakan pencegahan yang diambil, terutama dalam mengelola risiko dan ketidakpastian. Manajemen risiko memastikan bawah risiko dapat diidentifikasi, diperiksa dan dimitigasi dimana para stakeholder sebagai kunci dalam setiap pengambilan keputusan. Penerapan manajemen risiko dalam suatu proyek sangat diperlukan agar tingkat keberhasilannya tinggi dan menghasilkan keuntungan yang tinggi pada tim proyek. Pada penelitian ini dilakukan studi risiko dan biaya dengan mengidentifikasi, mengevaluasi terhadap laporan HAZOP studi terhadap dampak biaya. Analisis risiko dan biaya dievaluasi  dengan menggunakan  metode simulasi Monte Carlo dengan bantuan perangkat lunak Crystall Ball Versi 11.1.2.3 untuk menentukan konsekuensi risiko dan biaya apa saja yang paling signifikan dalam suatu sistim pada instalasi produksi dan kelayakan suatu proyek untuk dapat dilanjutkan pada tahap konstruksi. Studi Risiko dan biaya pada tahap FEED (perencanaan awal) dengan mengevaluasi laporan HAZOP dilakukan dengan teknik probabilitas menggunakan bantuan software crystal ball Ver.11.1. Dari hasil simulasi pada tingkat keyakinan 90% diperoleh nilai rentang risiko yang masuk dalam kategori Low (rendah) berdasarkan spesifikasi ring rangking dari pihak OWNER. Sedangkan estimasi biaya proyek berdasarkan standar AACE pada tingkat keyakinan 90% masih berada dalam pada rentang nilai biaya tersebut. The construction industry for industrial buildings, especially the Oil and Gas industry, is very vulnerable to the risk of uncertainty because of the nature of its business from the initial investment appraisal of the project to the physical completion at the end of the project. And it is also very vulnerable to danger if there are no appropriate steps and precautions taken, especially in managing risks and uncertainties. Risk management ensures that risks can be identified, examined and mitigated by which stakeholders are key in every decision making. The application of risk management in a project is very necessary so that the success rate is high and produces high profits on the project team. In this research, a risk and cost study is carried out by identifying, evaluating the HAZOP study report on the impact of costs. Risk and cost analysis is evaluated using the Monte Carlo simulation method with the help of the Crystall Ball software Version 11.1.2.3 to determine the consequences of the most significant risks and costs in a system at a production plant and the feasibility of a project to proceed at the construction stage. Risk and cost studies at the FEED (initial planning) stage by evaluating the HAZOP report were carried out using probability techniques using the help of crystal ball software Ver.11.1. From the simulation results at a 90% confidence level, the risk range values are included in the Low category based on the ring rank specifications of the OWNER. While the estimated project costs based on AACE standards at a 90% confidence level are still within the range of these cost values.
PENERAPAN ANALISIS VALUE ENGINEERING DENGAN TEORI TRIZ PADA SUBSTRUCTURE PROYEK X Steven, Steven; Johan, Johny
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan Vol 3, No 1 (2019): Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmstkik.v3i1.2773

Abstract

Kesuksesan suatu proyek merupakan hal yang ingin dicapai oleh seluruh pihak yang terlibat di dalamnya. Inefisiensi struktur yang terdapat dalam suatu proyek dapat menghalangi pencapaian kesuksesan yang diharapkan dalam suatu proyek. Oleh karena itu, diperlukan suatu teknik yang dapat menanggulangi permasalahan tersebut. Salah satu teknik yang dapat digunakan adalah value engineering. Dalam beberapa studi, telah dilakukan modifikasi pada analisis teknik value engineering. Salah satu modifikasi yang dimaksud adalah dengan menerapkan teknik TRIZ. Penerapan teknik TRIZ dalam analisis value engineering diyakini dapat memberikan kemudahan dalam menemukan solusi dalam permasalahan yang dihadapi. Struktur pondasi suatu proyek high rise building akan dijadikan objek studi. Studi ini bertujuan untuk menemukan sistem pondasi yang dapat diterapkan pada objek studi. Teknik TRIZ yang dilakukan dalam studi ini hanya diterapkan dalam fase kreatif yang terdapat di dalam analisis value engineering. Sistem awal pondasi yang diterapkan dalam objek studi adalah sistem bored pile foundation. Sistem bored pile foundation memiliki total biaya pelaksanaan sebesar Rp 18.719.136.609,24, penurunan rata-rata sebesar 48,24 cm, waktu pelaksanaan selama 92 hari, dan skor penilaian sebesar 122,92. Penerapan teknik TRIZ dalam analisis value engineering memberikan dua buah alternatif, yaitu sistem raft foundation dan raft-pile foundation. Evaluasi yang dilakukan terhadap ketiga sistem yang dianalisis memberikan hasil bahwa sistem raft-pile foundation memberikan hasil yang paling baik dengan total biaya pelaksanaan sebesar Rp 15.910.991.105,30, penurunan rata-rata sebesar 14,17 cm, waktu pelaksanaan selama 87 hari, dan skor penilaian sebesar 144,58. Sistem raft-pile foundation memberikan penghematan biaya sebesar 15% terhadap sistem bored pile foundation.The success of a project is something that all parties involved in it want to achieve. The structure inefficiency found in a project can hinder the achievement of expected success in a project. Therefore, we need a technique that can overcome these problems. One technique that can be used is value engineering. In several studies, modifications have been made to the analysis of value engineering techniques. One modification is meant by applying the TRIZ technique. The application of TRIZ techniques in value engineering analysis is believed to provide convenience in finding solutions to the problems encountered. The foundation structure of a high rise building project will be the object of study. This study aims to find a foundation system that can be applied to the object of study. The TRIZ technique used in this study is only applied in the creative phase contained in the value engineering analysis. The initial foundation system applied in the object of study is the bored pile foundation system. The bored pile foundation system has a total implementation cost of Rp. 18,719,136,609.24, an average reduction of 48.24 cm, an implementation time of 92 days, and an assessment score of 122.92. The application of the TRIZ technique in value engineering analysis provides two alternatives, namely the raft foundation system and the raft-pile foundation. Evaluations conducted on the three systems analyzed give the result that the raft-pile foundation system provides the best results with a total implementation cost of Rp. 15,910,991,105.30, an average decrease of 14.17 cm, an implementation time of 87 days, and assessment score of 144.58. The raft-pile foundation system provides a cost savings of 15% over the bored pile foundation system.
ANALISIS RISIKO DAN PENCEGAHANNYA PADA PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG BERTINGKAT TINGGI DARI SISI KONTRAKTOR Calvin, Bernardus; Johan, Johny
Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan Vol 4, No 1 (2020): Jurnal Muara Sains, Teknologi, Kedokteran dan Ilmu Kesehatan
Publisher : Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmstkik.v4i1.6719

Abstract

The increasing number of population is increasing every year in the capital city of Jakarta, but is not proportional to the limitations of existing land at this time. Therefore, vertical construction or high rise building is one of the right solutions to overcome these problems. This study aims to identify the dominant risks involved in implementing high-rise building construction projects, obtain problem solving and provide recommendations or appropriate control over these risk variables. The research method was carried out by obtaining literature data from various journals and previous research, validating variables together with experts, distributing questionnaires to the respondents, then the data was processed with the help of the AHP (Analytical Hierarchy Process) method to determine the priority interests of the performance attributes and gives the weight of the rating of the parameter scale used. There are 9 risk categories in this study including safety, health & environment, critical material & supply management, contractor quality, subcontractor & vendor, engineering, project management, financial, human resources and external, which consists of 64 risk variables. The results of the data analysis found 21 variables included in the high risk category. Of the 21 variables, the most dominant risk variable is the design change variable from the owner. Preventive action or appropriate control of this risk variable can be done by the contractor by notifying the owner that the work of the change affects the cost and time of the project, then the process must follow the rules of the contract used, the purpose of the process is that the owner gives SI (site instruction) to the contractor for design changes until it is approved as a VO (variation order) by the owner. ABSTRAKPertambahan jumlah penduduk setiap tahun semakin meningkat di daerah ibukota Jakarta tetapi tidak sebanding dengan keterbatasan lahan yang ada pada saat ini. Oleh karena itu, pembangunan secara vertikal atau gedung bertingkat merupakan salah satu solusi yang tepat untuk mengatasi permasalahan tersebut. Penelitian ini bertujuan untuk mengidentifikasi risiko-risiko dominan yang terdapat dalam pelaksanaan proyek pembangunan gedung bertingkat tinggi, mendapatkan pemecahan masalah dan memberikan rekomendasi atau kontrol yang tepat terhadap variabel risiko tersebut. Metode penelitian dilakukan dengan mendapatkan data-data literatur dari berbagai jurnal dan penelitian terdahulu, melakukan validasi variabel bersama dengan para pakar, menyebarkan kuesioner kepada para responden, selanjutnya data diolah dengan bantuan metode AHP (Analytical Hierarchy Process) untuk menentukan kepentingan prioritas dari atribut kinerja dan memberikan bobot penilaian terhadap skala parameter yang digunakan. Terdapat 9 kategori risiko dalam penelitian ini antara lain safety, health & environment, critical material & supply management, contractor quality, subcontractor & vendor, engineering, project management, financial, human resource dan external yang di dalamnya terdiri dari 64 variabel risiko. Hasil dari analisis data didapatkan 21 variabel yang temasuk ke dalam kategori risiko tinggi. Dari 21 variabel tersebut, variabel risiko yang paling dominan adalah variabel perubahan desain dari owner. Tindakan pencegahan atau kontrol yang tepat terhadap variabel risiko ini dapat dilakukan oleh kontraktor dengan memberikan notifikasi kepada owner bahwa pekerjaan atas perubahan tersebut berpengaruh pada nilai biaya dan waktu proyek, kemudian prosesnya harus mengikuti kaidah-kaidah kontrak yang digunakan, maksud prosesnya adalah dari owner memberikan SI (site instruction) kepada kontraktor atas perubahan desain sampai disetujui sebagai VO (variation order) oleh owner.