p-Index From 2021 - 2026
0.444
P-Index
This Author published in this journals
All Journal Jurnal SPEKTRUM
Claim Missing Document
Check
Articles

Found 2 Documents
Search

POTENSI PLTMH DI BENDUNGAN SIDAN, DESA BELOK SIDAN, KABUPATEN BADUNG Natih Evan Bayu, I D G; Sukerayasa, I W; Indra Partha, Cok Gede
Jurnal SPEKTRUM Vol 11 No 1 (2024): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2024.v11.i01.p15

Abstract

The potential of new renewable energy is highly needed to support Clean Energy Bali, and one of the viable energy sources is Micro Hydro Power Plant (PLTMH). The design of the Sidan Dam PLTMH is based on the construction of the Sidan Dam area in Belok Sidan Village, Badung Regency. The planning of the Sidan Dam PLTMH only extends to the construction of the penstock. In this Capstone Project, the design of the Sidan Dam PLTMH utilizes water discharge and head height data from the Sidan Dam planning. This data is used to determine the design, type of water turbine, dimensions of the water turbine, and to determine the appropriate generator capacity. The calculation results indicate that the Sidan Dam PLTMH has a potential capacity of 290.83 kW with a Francis turbine type and a generator capacity of 472.59 Kva. It is estimated to generate an annual energy output of 1,783,396 kWh with a capacity factor 70%.
PERANCANGAN PLTMH UNTUK MENDUKUNG WISATA HIJAU DI BENDUNGAN TAMBLANG, DESA SAWAN, KABUPATEN BULELENG Edy Putra Dewantara, K Fajar; Setiawan, I.N.; Sukerayasa, I W
Jurnal SPEKTRUM Vol 10 No 4 (2023): Jurnal SPEKTRUM
Publisher : Program Studi Teknik Elektro UNUD

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/SPEKTRUM.2023.v10.i04.p2

Abstract

The potential of water energy in Bali Province, especially in Tamblang Dam, is very high and can be utilized to provide energy needs in the surrounding area. On the other side, the Buleleng Regency Government took the initiative to develop tourism potential by planning a green tourism-based Tourism Destination Area (DTW), which utilizes renewable energy as a supporting component. One of the renewable energy potentials that can be utilized in Tamblang Dam is Micro Hydro Power Plant (PLTMH), which is designed with a designed flow rate of 2.21 m3/s with a capacity of 1.2 MW. The design of Micro Hydro Power Plant of Tamblang Dam requires an initial investment cost of Rp 2,434,358,091, and based on the results of economic analysis, the design of Micro Hydro Power Plant of Tamblang Dam is classified as feasible for investment, with NPV of Rp 68.6 billion, BCR 40.81, and PP less than 10 years.