Ardiyanto, Yudhi
Jurusan Teknik Elektro Fakultas Teknik Universitas Muhammadiyah Yogyakarta

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Implementasi Metrik Keluaran Unjuk Kerja Network Intrusion Detection System Ardiyanto, Yudhi
Semesta Teknika Vol 19, No 2 (2016): NOVEMBER 2016
Publisher : Semesta Teknika

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Perfomance of Network Intrusion Detection System (NIDS) very important to be monitored, because this system must perform packet inspection on computer network. Failure to detect data packets can produce malicious packet sneak into networks. Snort is one of the NIDS plug ins in the form of perfomance statistics that will provide performance information in real time, in the form of comma delimited value format. It takes long time to generated performance information. Thepigdoktah is a tools that can be used to process the output performance of the NIDS to be more informative .This research has been successfully implemented on a computer network, one of the performance information that can be generated is the average packet loss amounted to 0,012%.
Estimation of Power Transformer Loading Based on Population Growth: A Case Study in Kulon Progo Regency Ardiyanto, Yudhi; Suripto, Slamet; Mujaahid, Faaris; Anshori, Rohman Try; Jusman, Yessi; Arkan, Fardhan
Journal of Electrical Technology UMY Vol 3, No 4 (2019): December
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/jet.3465

Abstract

Along with technological advances, it is estimated that the gross regional domestic product (GRDP) of Kulon Progo Regency increases annually by 7.6%, and the population growth of Kulon Progo regency increases annually by 0.9%. However, after assuming with Muara Bungo Regency as a reference to GRDP growth and Population of Kulon Progo Regency due to the influence of the Establishment of New Yogyakarta International Airport (NYIA) in 2019, the population growth every year is 15.78%. While GRDP in 2018 until 2019 equals to 82.91% and next year equals to 7.6 %. Load forecasting the burden for the next ten years by using multiple linear regression affected by NYIA in 2019, the loading of the 150 kV Wates substation is only up to 2021 for the power transformer I of 24.83 MW and the power transformer II 55.40 MW. So it is estimated that for 2022, power transformer I and power transformer II of 150 kV Wates Substation are no longer able to serve the loading. Then, in 2021 a feeder shift and uprating power transformer I need to be conducted. In 2024 a power transformer III is needed. In that year the feed formation from power transformer I and power transformer II was changed to power transformer III.