Manajemen Risiko Pada Proyek Pembangunan Jaringan Pipa Air Limbah Komunal Pratama, Enif Asfarianto; Muhaemin, Aris
Journal of Industrial and Engineering System Vol. 3 No. 2 (2022): Desember 2022
Publisher : Program Studi Teknik Industri, Fakultas Teknik, Universitas Bhayangkara Jakarta Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31599/yepypw75

Abstract

The sub-zone 5 communal sewerage pipeline construction project has been carried out and has onlybeen realized 41% with physical development of 35% in the 2016 Regional Capital Investment FiscalYear. This project is a project implemented to improve domestic wastewater services from tourismfacilities, hotels, and other public facilities. The treatment system used is a centralized or communalpiping system as well as expanding the wastewater pipe network system in tourist areas. Based on this,a research is needed on the risks that occur during project development. The research was carried outthrough interviews with experienced and skilled personnel, making and distributing questionnaires,testing the results of questionnaire data by testing the validity and reliability of the risks that occurredin the implementation of this project development. The risk obtained in this study is 71. specifications andaddendum provided by the owner), including unacceptable, 50 (70.42%) risk ( quality concrete Pile Anchorge thatdoes not comply with the specifications approved) including undesirable, 9 (12.68%) risk (operational andoverhead costs are high) including acceptable, 4 (5.63%) risk (the use of the funds out of contract) includingnegligible. Risk mitigation is only given to major risk include risk unacceptable and undesirable risk. Based onthe results of the risk management, implemented regulations on ownership of risk (risk ownership) againstperpetrators (project owners, consultants, planners, consultants and contractor supervision) involved in theimplementation
Implementation of Time Performance Control, Donator System, and Coordination Level in Mosque Construction in Indonesia Pratama, Enif Asfarianto; Suroso, Agus
ASTONJADRO Vol. 14 No. 2 (2025): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v14i2.17559

Abstract

The process of building a mosque requires competent human resources and community participation. In addition, the availability of funds and support from the government or local authorities can also affect the duration of mosque construction. This study aims to analyze the effect of change orders on the availability of human resource skills and project implementation time performance in West Nusa Tenggara. The research method with quantitative surveys to determine the relationship between change orders, availability of HR skills and time performance will be made in a path diagram model, and analyzed using SEM-PLS with a sample of 104 respondents. The results of the study indicate that design, donors, and coordination together have a significant influence on change orders in mosque construction projects. Change orders in mosque construction projects have a significant impact on human resources, Human resource competence has a significant influence on the time performance of mosque construction projects and Controlling design, donor, and coordination variables is the key to reducing the frequency of order changes, increasing human resource competence, and ensuring optimal time performance in mosque construction projects.