This Author published in this journals
All Journal Extrapolasi
Ratri, Ika Wahyuninng
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PENETAPAN ALTERNATIF PELAKSANAAN PROYEK BERDASARKAN KRITERIA BIAYA PADA PEMBANGUNAN SARANA DAN PRASARANA KOMPLEK ISLAMIC CENTER DI SAMPIT Ratri, Ika Wahyuninng
EXTRAPOLASI Vol 7 No 01 (2014)
Publisher : Universitas 17 Agustus 1945 Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30996/exp.v7i01.956

Abstract

For contractors, profit is one of the goals in an project activities. Therefore, planning the implementation of activities by considering the concept of time value of money in financial analysis is very important and very useful to keep the cash flow that will be generated in order for project to succeed as a expected. This study aims to assess the feasibility of an investment decision and predict future profits are adjusted to the prevailing bank interest aplly within the time frame specified net present value  method.  The result of this study indicate that the value of the maximum profit that can be generated from the optimization of the cost and time that has been implemented exclude taxs is for  26.87 % or Rp. 15.158.527.000,- (fifteen billion worth of one hundred fifty-eight million five hundred twenty seven thousand rupiah)Key words : time value of money, net present value, project management.