Claim Missing Document
Check
Articles

Found 3 Documents
Search

Analisis Kinerja Dan Manajemen Lalu Lintas pada Bundaran ITS dan Bundaran Mulyosari Kota Surabaya Satoinong, Laif; Mardijono, Mardijono; Donny, Shofwan; Ray, Norman; Budi, Leonardus Setia
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol 2 No 1: March 2019
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v2i1.1483

Abstract

The aim of this thesis is solving the problem of jamming it happen at ITS roundabout and Mulyosari. In research and management of data, and theory which use is MKJI of 1997. The solving of this thesis needed as traffic light data on existing situation. Then, there are survey data at ITC roundabout and Mulyosari roundabout on 2018.  The function of this survey is to know about the real condition performance both of Circles.  Finally, both of circles are not effective (Jamming traffic light). Forward, predictions of performance traffic light in 5 years later until 2022 from 2018, finally more not effective. In this thesis gives the solution in case should use the traffic light. Finally, the solution as counting, that both of roundabout about traffic light become effective.
Analisis Kinerja Dan Manajemen Lalu Lintas pada Bundaran ITS dan Bundaran Mulyosari Kota Surabaya Satoinong, Laif; Mardijono, Mardijono; Donny, Shofwan; Ray, Norman; Budi, Leonardus Setia
Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil Vol. 2 No. 1: March 2019
Publisher : Universitas Dr. Soetomo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25139/jprs.v2i1.1483

Abstract

The aim of this thesis is solving the problem of jamming it happen at ITS roundabout and Mulyosari. In research and management of data, and theory which use is MKJI of 1997. The solving of this thesis needed as traffic light data on existing situation. Then, there are survey data at ITC roundabout and Mulyosari roundabout on 2018.  The function of this survey is to know about the real condition performance both of Circles.  Finally, both of circles are not effective (Jamming traffic light). Forward, predictions of performance traffic light in 5 years later until 2022 from 2018, finally more not effective. In this thesis gives the solution in case should use the traffic light. Finally, the solution as counting, that both of roundabout about traffic light become effective.
The Impact Of Communication On Project Performance In Construction Projects Satoinong, Laif; Desnalia, Desnalia; Mintura, Steven; Paroipo, Wahyu Trifadil; Gulthom, Abel; Simamora, Jawarta; Zebua, Dermawan
Innovative Research in Civil and Environmental Engineering Vol. 1 No. 1 (2024): IRCEE - October
Publisher : CV. SINAR HOWUHOWU

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70134/ircee.v1i1.45

Abstract

Effective communication is a critical factor influencing the success of construction projects, impacting project performance in terms of time, cost, and quality. This study investigates the relationship between communication practices and project outcomes in the construction industry. Utilizing a mixed-methods approach, quantitative data were collected through surveys with project stakeholders, while qualitative insights were obtained from interviews with experienced construction professionals. Results indicate that projects with structured and clear communication practices demonstrate improved performance, reduced delays, and cost efficiency. Key barriers identified include language differences, inconsistent information flow, and delayed updates. The study highlights the importance of adopting digital communication tools and standardized protocols to enhance communication effectiveness. These findings underscore the need for strategic communication management to achieve optimal project performance