Claim Missing Document
Check
Articles

Found 2 Documents
Search

Perbandingan Dampak Video Edukasi, Leaflet, dan Edukasi Rutin terhadap Peningkatan Pengetahuan Ibu tentang Tanda Bahaya Masa Nifas Wahyu Maryuni, Sri; Noviardi; Mayangsari, Nastiti H
Jurnal Ilmu Multidisiplin Vol. 4 No. 1 (2025): Jurnal Ilmu Multidisplin (April–Mei 2025)
Publisher : Green Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.38035/jim.v4i1.838

Abstract

Masa nifas merupakan periode berisiko tinggi bagi ibu dan bayi, dengan 52% kematian ibu terjadi pada fase ini. Sebagian besar kasus tersebut dapat dicegah jika ibu memiliki pengetahuan tentang tanda bahaya masa nifas. Namun, rendahnya literasi kesehatan dan kurangnya metode edukasi yang standar menjadi kendala. Penelitian ini membandingkan efektivitas tiga metode edukasi—video, leaflet, dan edukasi verbal rutin—terhadap peningkatan pengetahuan ibu. Uji klinis acak dilakukan terhadap 80 ibu pasca persalinan di RS Arifin Achmad, Riau. Hasil menunjukkan bahwa edukasi video memberikan peningkatan pengetahuan yang paling signifikan (p < 0,001). Dengan demikian, video merupakan media edukasi yang lebih efektif dalam meningkatkan pemahaman ibu terhadap tanda bahaya masa nifas.
Analisis Performansi Mesin Pre-Turning dengan Metode Overall Equipment Effectiveness pada PT APCB Fajrah, Nofriani; Noviardi
Jurnal Optimasi Sistem Industri Vol. 17 No. 2 (2018): Published in October 2018
Publisher : The Industrial Engineering Department of Engineering Faculty at Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1022.74 KB) | DOI: 10.25077/josi.v17.n2.p126-134.2018

Abstract

PT APCB is an electronics company that produces electronic device components called Narrow Shaft. The purpose of this study is to evaluate the maintenance activity in a pre-turning machine by measuring the Overall Equipment Effectiveness (OEE) level. The OEE level is obtained based on the Availability, Performance, and Quality Rate of the pre-turning machine maintenance activities. In addition, the purpose of this study is to identify the causes of the ineffectiveness of pre-turning machine maintenance activities and provide improvement suggestions for maintenance effectiveness at PT APCB. Based on the results of the calculation of the OEE value it is known that the PT APCB company still has not reached the world standard of 85%. This shows that the company still has to improve maintenance activities in the pre-turning process. The calculation of OEE value shows that the lowest OEE level in February 2016 was 48.31%, while the highest OEE level in September 2016 was 83.23%. The low performance of the pre-turning machine process was due to the ineffectiveness of maintenance activities which were caused by 14 factors. The primary causal factor with the highest value is the bar feeder problem with the highest request frequency value of 250.