Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS KEBUTUHAN PERLENGKAPAN DAN TAHAPAN PENGERJAAN SELANG DAN PIPA PADA PROSES PERAKITAN PESAWAT QUEEN AIR B80 DI PROGRAM STUDI TEKNIK PESAWAT UDARA Febrian Ramadhan; Ego Widoro; Diding Sunadri
Langit Biru: Jurnal Ilmiah Aviasi Vol 10 No 3 (2017): Langit Biru: Jurnal Ilmiah Aviasi
Publisher : Politeknik Penerbangan Indonesia Curug

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (552.779 KB)

Abstract

The moving process requires that the aircraft be separated into several sections to accommodate the kind of transporter. In order to the aircraft can be used as training aids in program studi Teknik Pesawat Udara (TPU) need to be done re-installation of parts that have been removed when the moving process. One of the parts to be reinstalled is the hoses and pipes. Because the inadequate detailed reinstalling guidelines for hose and pipe reinstallation and storage of aircraft parts is poorly controlled when the moving process, it’s resulted many parts of the aircraft that are not in a group of systems require an analysis of the processing stage or the installation process of the Queen Air B80 aircraft hose and pipe. Based on results of performed analysis, the stages for reinstall Queen Air B80 aircraft hose and pipe are collects the available aircraft documents, after that checks all the existing parts and collects into its system and then checked the condition of the parts carefully and found the number of existing and missing parts. After that make list of available and unavailable component and continued with make the installation stage of hose and pipe into the form of task card.
Analysis Of Factors Inhibiting Employees From Reading Kwh Post-Paid Meters In The Field (PT. IDO SINERGI) Ahistasari, Asih; Febrian Ramadhan; Irman Amri; Ashar
Journal of Industrial System Engineering and Management Vol. 2 No. 2 (2023): Journal of Industrial System Engineering and Management (Edisi December)
Publisher : PT. SAFARI AMALIA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56882/jisem.v2i2.19

Abstract

PT. PLN (PERSERO) as a State-Owned Enterprise to provide the best service for all electricity users in Indonesia, PLN which takes care of all aspects of electricity for the public interest throughout Indonesia. At first PLN used postpaid electricity kwh recording calculating tool, where the kWh meter recording used analog system. Several problems and complaints from the public regarding the use postpaid electricity in the form of late payments, meter recording errors and erratic bills, PLN specifically for the Sorong branch in collaboration with PT. Ido Sinergi as a service provider, especially in the work of recording kwh meters, must be able to provide satisfaction to PLN as its partner. When recording kwh meters, factors that often hinder activities in the field such as fence locks, closed houses, empty houses, tall meters, opaque meters, fierce animals, unloading meters, lost meters other unexpected factors. The purpose this study to find out the various factors inhibiting kWh meter readings in the field, the data obtained was then processed using data analysis tool used to answer the research problem using the Pareto Diagram. The conclusion from this study is that the inhibiting factors for reading kwh meters in the field are fence locks, closed houses, empty houses, tall meters, opaque meters, fierce animals, unloading meters, missing meters with a total of 598 constraints from 20,580 customers, along with the percentage pk 31%, rt 13%, rk 15%, mt 7%, mbrm 15%, hg 3%, mb 10%, mh 7%.