Claim Missing Document
Check
Articles

Found 2 Documents
Search

Pembuatan Generator Magnet Permanen 12 Kutup Menggunakan Motor Induksi Yuli Handika
CYCLOTRON Vol 6 No 2 (2023): CYCLOTRON
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30651/cl.v6i2.18255

Abstract

Generator magnet  permanen merupakan salah satu generator populer untuk  sistem energi terbarukan. Generator magnet  permanen dipilih karena efisiensi dan keandalannya yang tinggi. Pada penelitian ini dibuatlah generator magnet permanen 12 kutup dari motor induksi pompa air power jet 125 Watt, dengan cara merubah lilitan stator dan menambahkan Neodymium magnet pada rotor. Setelah lilitan stator dirubah dan magnet telah dipasang pada rotor kemudian dilakukan pengujian dengan memutar rotor menggunakan bor cordlees dan dilakukan pengukuran tegangan pada keluaran generator.  Dari hasil percobaan yang dilakukan dapat dilihat bahwa perhitungan secara teori sangat jauh berbeda dengan praktek. Hal ini disebabkan oleh kurang kuatnya medan magnet yang dihasilkan oleh rotor. 
Pembangkit Listrik Tenaga Air Pikohidro untuk Kebutuhan Pengembangan Lokasi Wisata Bendungan Desa Menaming Rokan Hulu Riau: Hydroelectric Power Plant Pico Hydro for the needs of the Menaming Village Dam Tourism Location, Rokan Hulu, Riau Asral, Asral; Fatra, Warman; Handika, Yuli; Pekei, Ferdinandus
PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat Vol. 9 No. 6 (2024): PengabdianMu: Jurnal Ilmiah Pengabdian kepada Masyarakat
Publisher : Institute for Research and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33084/pengabdianmu.v9i6.5894

Abstract

The Menaming Dam is located in Menaming Village, about 3 km away from residential areas, so it is far from the reach of electricity service providers. From the dam, the water is distributed through irrigation canals to the rice fields and fishery and contains hydraulic power, then could be utilized for electricity generation. The location of the dam has attractive views so that it becomes tourism, but there is no electricity available, causing its development to be hindered. Utilization of water resources in irrigation can be done by developing a waterwheel as driving for electricity generators. The power plant with an undershot waterwheel is very suitable to be developed because it is easy to manufacture and maintain. Besides that, the structure and shape can add to the beauty and attractiveness of visitors to tourist sites. Now a hydroelectric power plant has been installed with a total power of about 70 W. Electricity is transmitted using cables through the power poles and an LED light is installed on each of them. Furthermore, in one of the stalls in the tourist location, the installation of lights and sockets for charging mobile phones was made. Lights were also installed in an adjacent house.