Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS BIAYA DAN WAKTU MENGGUNAKAN METODE EVM (EARNED VALUE MANAGEMENT) Febrianti, Pelangi Putri; Alfandi, Brian
Structure Vol 5, No 2 (2023): STRUCTURE (JURNAL SIPIL)
Publisher : University of Muhammadiyah Tangerang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31000/civil.v5i2.10020

Abstract

Pada dunia konstruksi sangat sering mengalami keterlambatan pada saat pelaksanaan dimana realisasi dilapangan tidak sesuai jadwal rencana. Disebabkan beberapa faktor yang terjadi meskipun sudah dipersiapkan rencana secara matang namun pada praktik dilapangan masih banyak timbul masalah dalam pelaksanaan. Maka digunakanlah salah satu metode yaitu Metode EVM (Earned Value Management) untuk mengatasi masalah tersebut. Pada metode ini memiliki indikator yang digunakan analisa antara lain: BCWP (Budget Cost of Work Performance), BCWS (Budget Cost of Work Schedule), ACWP (Actual Cost of Work Performance), SV (Schedule Variance), CV (Cost Variance), SPI (Schedule Performance Index), CPI (Cost Performance Index). Pada penelitian ini bertujuan untuk mengetahui performa biaya dan waktu dalam pelaksanaan pekerjaan bore pile, pile cap, dan tie beam dari minggu ke-1 sampai dengan minggu ke-12 pada Proyek Pembangunan Kantor UPT Crew KA Stasiun Depok Lama dengan menggunakan Metode EVM (Earned Value Management). Dari hasil penelitian ini diketahui pelaksanaan tidak sesuai dari jadwal rencana. Pada minggu ke-2 sebesar 1,002 dan minggu ke-6 sebesar 1,013 menunjukan cepat dari rencana. Dan pada minggu ke-2 sampai minggu ke-5 menunjukan cost ove-rrun. Hambatan yang terjadi pada proyek ini adalah dari manusia, mesin dan lingkungan.
Development of Efficient and Environmentally Friendly Septic Tanks Alfandi, Brian; Mukmin, M. Ali; Rosyati, Ria; Abadiyah, Siti
Jurnal Pensil : Pendidikan Teknik Sipil Vol. 13 No. 3 (2024): Jurnal Pensil : Pendidikan Teknik Sipil
Publisher : LPPM Universitas Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21009/jpensil.v13i3.44130

Abstract

In many communities in Indonesia, there are still many areas where their homes do not have a toilet (water closet) that meets hygiene and health requirements. This is caused by many factors, including because there are still many people who live below the poverty line, both economically poor and poor in knowledge (human resources). Procurement of toilets (water closets) which also include a septic tank system with a minimum output that is environmentally friendly and of course cost efficient is very necessary to improve public health. Based on the description above, this research was created in order to provide procurement and development of efficient and environmentally friendly septic tanks. This research is very necessary because of the discovery of an efficient alternative material by using used drums which can be used as septic tanks in Lampung, but it has not deepened the issue of waste output that is safe for the environment. This research was carried out using a constructivist qualitative method with assistance from DIGILIB Digital Library & OPAC UB sources. is at Brawijaya University Malang, where the author is registered as a student in the environmental science doctoral program at Brawijaya University Malang.