Diah Ayu Restuti Wulandari
Department of Civil Engineering, University of Narotama

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

An Analysis Study Flood Improving The Capacity Reduction Long Storage And Bozem: ( A Case Study In One Of The Factories A Coffee At Sidoarjo Regency) Irfan Nur Rozzaq; Diah Ayu Restuti Wulandari
Journal of World Conference (JWC) Vol. 2 No. 1 (2020): January 2020
Publisher : NAROTAMA UNIVERSITY, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29138/prd.v2i1.123

Abstract

. Industry is an important infrastructure in the city. At the location of the coffee factory in the village of Bringinbendo, Sidoarjo with an area of ??± 119,372 m², there is a lack of green open space and small dimensions so that it cannot accommodate the water discharge during high rainfall. The analysis data used is 10 years of rainfall data observations from the data Rain Station of Botokan, Sruni, Ketegan and Karangnongko. In this study the method used Log Pearson Type III method. So that the 5 year return rain discharge is 105.75 m³/sec. The existing channel capacity is 4040.42 m³ while the required volume is 4947.16 m³ with a flood discharge of 2,450 m³ / sec. Then it needs a long storage with a capacity of 2575 m³ and bozem with a capacity of 337.5 m³ so that it can accommodate the volume of water.