Fayez Aldawi
Yanbu Industrial College

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Micropower system optimization for the telecommunication towers based on various renewable energy sources Ahmed Abdulmula; Kamaruzzaman Sopian; Norasikin Ahmad Ludin; Lim Chin Haw; Abdelnaser Elbreki; Fayez Aldawi; Hazim Moria
International Journal of Electrical and Computer Engineering (IJECE) Vol 12, No 2: April 2022
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijece.v12i2.pp1069-1076

Abstract

This study investigates the technical and cost-effective performance of options renewable energy sources to develop a green off-grid telecommunication tower to replace diesel generators in Malaysia. For this purpose, the solar, wind, pico-hydro energy, along with diesel generators, were examined to compare. In addition, the modeling of hybrid powering systems was conducted using hybrid optimization model for energy (HOMER) simulation based on techno-economic analysis to determine the optimal economically feasible system. The optimization findings showed that the hybrid high-efficiency fixed photovoltaic (PV) system with battery followed by 2 kW pico-hydropower and battery are the optimal configurations for powering off-grid telecommunication towers in Malaysia with the lowest net present cost (NPC) and cost of energy (COE). These costs of NPC and COE are more down than diesel generator costs with battery by 17.45%, 16.45%, 15.9%, and 15.5%, respectively. Furthermore, the economic evaluation of the high-efficiency solar fixed PV panels system annual cash flow compared to the diesel generator with the battery system indicated a ten-year payback period.