T. V. Myatezh
Novosibirsk State Technical University

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

Determination of the price for a hydro resource with consideration of operating conditions of hydropower plants using complex criteria of profit maxmization T. V. Myatezh; Y. A. Sekretarev
International Journal of Electrical and Computer Engineering (IJECE) Vol 11, No 4: August 2021
Publisher : Institute of Advanced Engineering and Science

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.11591/ijece.v11i4.pp2733-2742

Abstract

In this paper, a universal method has been developed to determine the price of a hydro resource (one cubic meter) for the operational regulation of a hydropower plant (HPP), which is a combination of an optimization method and a method for assessing the marginal utility. The proposed approach is based on the correct representation of differential incremental rate characteristics of water at an HPP and fuel at a thermal power plant (TPP). To know the price of a hydro resource used for electricity generation at a hydropower plant. This gives the possibility to increase the efficiency of management both at a hydropower plant, and in a water utilization system as a whole. Using the examples of Novosibirsk HPP, it is expected to develop an estimation of economic effect from the implementation of the developed criteria, the proposed method of the calculation of a hydro resource price at HPP, and the method of separating fuel costs at CHPP. As a result of the implementation the developed method for the HPP, a price of electricity sold in the flexible energy market will be compared to the price of the electricity produced and sold at CHPP, being equal to approximately 330 rubles/MW h.