Mochtar Yunianto
Unknown Affiliation

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Otomatisasi Pengolahan Data Pada Sistem Pelayanan Rental CD Tisanda Kurniawan Syafi’i; Mochtar Yunianto; Yustina Retno
JURNAL GAUNG INFORMATIKA Vol 4 No 1 (2011): Jurnal Gaung Informatika Vol.4 No.1 Januari Tahun 2011
Publisher : Universitas Sahid Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CD rental at Tisanda is uncomputerized that caused slow in time and energy-consuming transaction. Information System of CD rental is an alternative solution to solve problem in the data analysis. CD rental information system is a system that has borrowing and repayment process, including providing information about the number of existing CDs. This study discusses lending transactions, refunds, and penalties. This research method is observation, interviews, and literature. The system is built using Visual Basic as the language program and mySQL as database with mysql-connector-odbc-win32-3:51:23 as connectors. CD Rental Information System includes the CD report, rent, damage, and loss of earnings. This system is more efficient because it can minimize data storage. In addition, it takes less energy and need a short time to input data or reports and data can be accessed more quickly than before. Rental Information System at Tisanda alsouses a barcode reader so the transactions can be faster.
Sistem Pendukung Keputusan Untuk Seleksi Penyedia Pengadaan Barang Dan Jasa Di Departemen Pekerjaan Umum Direktorat Jendral Sumber Daya Air Yogyakarta Wahyudi .; dahlan susilo; Mochtar Yunianto
JURNAL GAUNG INFORMATIKA Vol 3 No 2 (2010): Jurnal Gaung Informatika Vol.3 No.2 juli Tahun 2010
Publisher : Universitas Sahid Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Selection of providers of goods and services is a routine work carried out by the Ministry of Public Works Directorate General of Water Resources (DPU DirJen SDA) Yogyakarta as auctioneer project procurement. The auction process conducted by 2 steps that must be passed by each participant selection, namely the pre-selection andselection process. Pre-selection stage takes a long time from the announcement of the project which will be auctioned to the technical bid evaluation assessment of participant selection document roadmap participants. The next stage of the selection process, this process will not work if the previous stage of the selection of participants who did not pass the next phase still could not accept the results of the selection committee on the assessment of the value of the technical evaluation of bids that have been made by the participant selection, because the rule is no objection period provided to participants if the selection can not accept the results of the assessment selection committee. The selection process will run to the next stage after the selection of participants receiving the results of the assessment of the selection committee and given objection period had expired. Based on the background of the existing problems can be formulated on how to make a design decision support system for the selection of providers of goods and services in DPU DirJen SDAYogyakarta. The decision support system aims to implement a decision support system for the selection of goods and services providers to the selection committee in DPU DirJenSDA Yogyakarta. The system works based on the data input of the selection committee which will then be processed by the system based on the required criteria. The data has been processed the system will be displayed and ranked by graphs of each participant selection. From these results we can conclude the committee which participantsprocurement of goods and services providers are entitled to handle the project.