I.M. Suartika
[Scopus ID: 57202279545] Universitas Mataram

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Kajian timbulan sampah untuk menentukan produksi sampah rumah tangga dan evaluasi kapasitas TPS (studi kasus: kelurahan Jemmpong Baru-Mataram) I.M. Suartika; S. Syahrul; M. Mirmanto; M. Wirawan
Dinamika Teknik Mesin Vol 11, No 2 (2021): Dinamika Teknik Mesin
Publisher : Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (220.779 KB) | DOI: 10.29303/dtm.v11i2.417

Abstract

TPS is a temporary shelter of garbage before it is transported or disposed of to landfill. In order for TPS to accommodate garbage, it is necessary to know the volume of garbage to be served. This study aims to; firstly knowing the occurrence of household waste produced in the village of Jempong Baru, the second conducts an evaluation of the feasibility of TPS capacity to temporarily accommodate the waste produced based on the results of the study. The method used is descriptive method by conducting garbage survey based on SNI-19-3964-1994 and TPS capacity evaluation based on PERMEN PU RI No. 03/PRT/M/2013. From the results of the study obtained the emergence of household waste produced by the community in the village of Jempong Baru 6183 kg / day or 41907 liters / day equal to 41.9 m3 / day. Organic waste 3779 kg / day, plastic waste 572.5 kg / day, other non-organic waste 1775 kg / day. Then the results of measurement and evaluation of existing TPS with a capacity of 32 m3 with a waste ritasi one rate per day. So the existing TPS capacity is not enough to accommodate the volume of waste produced per day as much as 41.9 m3. The TPS capacity should be greater than the volume of waste produced. The results of this study are very useful to make improvements to the waste management system in Mataram city and especially in the village of Jempong Baru which is efficient and effective.
Pengukuran waktu standar pembuatan produk sampan komposit sandwich untuk menentukan biaya poduksi I.M. Suartika; A.D. Catur; M. Mirmanto
Dinamika Teknik Mesin Vol 11, No 1 (2021): Dinamika Teknik Mesin
Publisher : Universitas Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (811.92 KB) | DOI: 10.29303/dtm.v11i1.416

Abstract

In the efforts to develop the boat of composite sandwichto overcome the scarcity of wood as a boat material, thedetermination of production costs becomes veryimportant to be studied. The purpose of this study is toconduct a study related to the amount and time requiredin the completion of product units with the stop watchtime study method. The results of the time study wereused to determine the cost or wages of labor in theproduction of the boat composite sandwiches. So that allcomponents of these costs will later determine thefeasibility of production of the boat composite sandwichproducts. Based on the results of the measurement ofwork time study known standard time production of theboat composite sandwich with two people labor and shiftwork 8 hours / day is 34 hours (equivalent to 5 days) andproduction capability 5 units / month. The results ofresearch related to production process costs are knownfixed costs (FC )= Rp. 1,288,655 and variable costs /units (c) = Rp. 2,664,333. By conducting break-evenpoint analysis obtained minimum production units permonth that can be produced by setting the selling price( ) of the product based on profit margin 5%, 10%,15%, 20%, 25%, i.e consecutively; 10 units/month, 5units/month, 4 units/month, 3 units/month, 2 units/month.