Poltak Nababan
Department of Industrial Engineering, Universitas Sumatera Utara

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

The fuzzy goal programming approach to production planning of intermediate gear spare parts: a case study Aulia Ishak; Poltak Nababan
Jurnal Sistem dan Manajemen Industri Vol. 4 No. 2 (2020)
Publisher : Universitas Serang Raya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (913.656 KB) | DOI: 10.30656/jsmi.v4i2.2143

Abstract

Production planning has an important role in the company's business processes. A company engaged in the manufacture of intermediate gear parts has a problem in optimizing its production system. The production planning system that occurs is still based on predictions from decision-makers. This study aims to optimize the production planning system to maximize the 15T intermediate gear spare parts' production capacity and the 30T intermediate gear spare parts. Optimization of production planning uses the fuzzy goal programming method to optimize objectives based on existing constraints such as working hours, profit tolerance values, and demand tolerance values. The results showed that the use of fuzzy goal programming was able to increase the production level by 2.765, with an increase in profit of 2.57%. Fuzzy goal programming implementation provides an optimal solution in increasing profits in accordance with company goals based on the constraints that occur.