Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : SAINTEK

Analisis Total Productive Maintenance Pada Industri Percetakan Farid Marhaban; Dwi Indra Prasetya; Fibi Eko Putra
Prosiding Sains dan Teknologi Vol. 1 No. 1 (2022): Seminar Nasional Sains dan Teknologi (SAINTEK) ke 1 - Juli 2022
Publisher : DPPM Universitas Pelita Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

In the production process there is still a lot of damage suffered on the machine, one of which is the production target that was not achieved due to the defective product. In the production process, one of the machines in the printing industry is the HD Speed ​​Master’s machine which often has problems, the HD Speed ​​Master’s machine used in the production process serves as a paper printing machine. A common problem with this machine is the high frequency of damage, so that the printing paper suffers from defects such as blurred ink, skewed process results, torn paper and there are parts that are not printed so as to interfere with production process. The purpose of this study was to identify the effectiveness of HD Speed ​​Master’s machine using Overall Equipment Effectiveness (OEE) approach. Based on the analysis conducted on the HD Speed ​​Master’s machine, the result from the OEE calculation is 81%. Does not meet the company's standard of 85%. The low OEE value is due to the large amount of downtime that occurs in the machine, so the machine does not work effectively and efficiently. Keywords: Maintenance, downtime, Total Productive Maintenance, Overall Equipment Effectiveness
Aplikasi Lean Manufacturing System Berbasis Value Stream Mapping Pada Industri Otomotif Aprilia Andeyu; Muhammad Aldi Albana; Fibi Eko Putra
Prosiding Sains dan Teknologi Vol. 1 No. 1 (2022): Seminar Nasional Sains dan Teknologi (SAINTEK) ke 1 - Juli 2022
Publisher : DPPM Universitas Pelita Bangsa

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The manufacturing industry competes in improving product quality and productivity by minimizing production costs. System changes directly or indirectly include machines, materials, people, methods, and the environment by adopting lean concepts. This Value Stream Mapping method aims to focus on improvement and waste areas, especially in the production process of painting the 15 k seat cowl product. The results of this study show that the implementation of Future State Mapping can help reduce the following: production lead time decreased by 58.9%, total cycle time decreased by 7.08% and total non-value added decreased by 7.12 %. This proves that adopting the Value Stream Mapping method can make significant improvements. Keywords: Lean Manufacturing System, Value Stream Mapping, Waste