Claim Missing Document
Check
Articles

Found 2 Documents
Search

Pembuatan Lampu Flip-Flop menggunakan Arduino Uno untuk mendukung Mata Kulaih Algoritma dan Pemrograman Irna Tri Yuniahastuti; Ina Sunaryantiningsih; Reza Aditya Putra
invotek Vol 19 No 2 (2019): INVOTEK: Jurnal Inovasi, Vokasional, dan Teknologi
Publisher : Universitas Negeri Padang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (476.15 KB) | DOI: 10.24036/invotek.v19i2.606

Abstract

The weakness of Electrical Engineering student in understanding the programming language is the background of this research. In addition, this material has been obtained in college, because students do not yet have a comprehensive understanding of the concept application of programming languages. Futhermore, limitations of implementing course in everyday life underlie poor student understanding. In this reseach, a jobsheet was created to support the Programming Algorithm course for Electrical Engineering student at PGRI Madiun University (UNIPMA) . It contains the programming language on the microcontroller, the microcontrolled used is Arduino which is esigned for creating flif-flop lamps. On the jobsheet contains 3 projects, namely installing Arduino, flashing LED, and flip-flop lights. Jobsheet was tested validated by 2 experts, namely linguists and material experts. The result of data analysis obtained with value of 3.55 with category of the feasible to use then the jobsheet tested on students obtained the results of the assessment of the material by 80.03% with category very feasible. So it can be concluded that this practical jobsheet is usefull for students and lecturer.
Skenario Perbaikan Nilai Keandalan Loss of Load Probability pada PLTH Pantai Baru Pandansimo Reza Aditya Putra; Irna Tri Yuniahastuti; Ridam Dwi Laksono
ELECTRA : Electrical Engineering Articles Vol 2, No 1 (2021)
Publisher : UNIVERSITAS PGRI MADIUN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25273/electra.v2i1.10500

Abstract

Indeks keandalan sistem tenaga listrik dikatakan baik atau handal yaitu ketika sistem tenaga listrik dapat menjamin ketersedian energi listrik bagi konsumen. Faktor yang menentukan tingkat keandalan sistem tenaga listrik salah satunya adalah nilai dari forced outage rate (FOR). Tingkat keandalan suatu sistem pembangkit energi listrik dapat diketahui dengan cara perhitungan LOLP (Loss of Load Probability). Pembangkit Listrik Tenaga Hibrid (PLTH) Pantai Baru Pandansimo di ketahui dengan perhitungan (Loss of Load Probability) memiliki nilai LOLP sebesar 51,3627 hari/tahun. Hal ini menunjukan sistem PLTH Pantai Baru Pandansimo tidak sesuai dengan standart PLN yaitu 1 hari/tahun. Dengan permasalahan tersebut maka dibuatlah skenario perbaikan 1 dan 2 nilai keandalan LOLP. Didalam perhitungan LOLP skenario 1 yaitu menganti grup KKP dengan unit pembangkit baru dan didapatkan lah nilai LOLP sebesar 9,6908 hari/tahun. Pada skenario 2 yaitu menambah unit pembangkit baru jadiĀ  skenario di PLTH Pantai Baru Pandansimo memiliki 4 pembangkit dan di dapatkan nilai LOLP sebesar 6,8186 hari/tahun. Pada skenario 1 dan 2 nilai nya sudah lebih baik dari pada sebelumnya tetapi belum memenuhi standart PT.PLN yaitu sebesar 1 hari/tahun