Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISA PRESSURE BUILD UP TEST MENGGUNAKAN SOFTWARE ECRIN DAN METODE MANUAL PADA SUMUR GAS CP-52 & CP-54 LAPANGAN CHAPIN Adven Charlos M Pappin; Trijana Kartoatmodjo; Pauhesti Rusdi
Journal of Mechanical Engineering and Mechatronics Vol 2, No 02 (2017): Journal of Mechanical Engineering and Mechatronics
Publisher : President University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (533.575 KB) | DOI: 10.33021/jmem.v2i02.324

Abstract

The CP-52 and CP-54 wells are located on the Tambun structure of Bekasi Regency of West Java Province with the target formation being Baturaja. The pressure build up analysis is carried out for monitoring activities to obtain reservoir and boundary, innitial pressure (Pi), permeability (k), skin (s), ΔP skin, average pressure (Pavg), and flow efficiency information. Tests performed on both wells are pressure build up test (PBU) and to analyze the method of Horner approach pseudo pressure and P2 either manually or with the help of software v.ex.2 v2.02 as validation.