Claim Missing Document
Check
Articles

Found 1 Documents
Search

REVITALISASI MICRO HYDROPOWER DI PERKEBUNAN TEH MEDINI KABUPATEN KENDAL, JAWA TENGAH SMK Negeri 2 Kendal
JURNAL LITBANG PROVINSI JAWA TENGAH Vol 9 No 1 (2011): Jurnal Litbang Provinsi Jawa Tengah
Publisher : Badan Perencanaan Pembangunan, Penelitian dan Pengembangan Daerah Provinsi Jawa Tengah

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36762/jurnaljateng.v9i1.273

Abstract

In the tea plantation Medini Kendal, there is micro hydropower plant installation main Dutch Colonial . Since 1993 this source energy can’t be used anymore. The purpose of this resource is to know how much the micro hydropower potential has, to analyze the destruction, re-design civil and electromechanical engineering and how to organize when re-function of this electric energy. The step of this resources include to know how much water flow, head examine and collect the data of the installations, than re-design civil and electromechanically engineering, include power channel, fore bay, trash rack, penstock water turbine, electric generator and installations of micro hydro power. The result survey on November 24, 2006 until march 24,2010 show minimum flow of water spring 0,101 m3/sec, effective head 46,7 m. Base on the calculations median from the efficiency 50-70% get electric power 27,5 kW. By Revitalization (re-function) programs, the electric energy can be use again to support for improve quality of people society life a round the installations of micro hydropower plant.