Kajian Metode Struktur Pelat Konvensional terhadap Pelat Pracetak Segmental dan Pelat Bondek Ditinjau dari Segi Waktu, Biaya dan Struktur Eko Adityo; Darman Katni; Arifien Nursandah
AGREGAT Vol 5, No 1 (2020)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1194.175 KB) | DOI: 10.30651/ag.v5i1.4977

Abstract

AbstractSelection of project implementation method is very important, because with correct implementation method it can give maximum results especially in terms of cost and time. One of the ways is replace conventional methods into modern ones. It raises to innovations in construction implementation methods that reduce wood material as formwork. In this study, the comparisons between conventional deck method, precast segment and bond deck in terms of time, cost and structure taken sampling from one floor which is fifth floor. Precast method used Hollow Core Slab (HCS). The required data are working drawings, budget estimate plan, Master Scedule, and AHSP Palembang 2017. Result of analysis in term of cost hollow core slab method is 8.45%, bigger than conventional method. Cost of bond deck method 9.56% is saving than conventional method. Implementation of hollow core slab and bond deck method 27,3% faster than conventional methods, the difference in moment of the hollow core slab method to the conventional method is 2,47%, or moment in the hollow core slab plate is bigger than conventional plate. On bond deck because of working moment is assumed same with conventional method, moment percentage is 0%..Keywords: Hollow Core Slab (HCS), Conventional, Bond Deck , Time, Cost, and Structure Comparison.AbstrakPemilihan metode pelaksanaan suatu proyek konstruksi sangat penting, karena dengan metode pelaksanaan yang tepat dapat memberikan hasil yang maksimal terutama jika ditinjau dari segi biaya maupun segi waktu. Salah satu cara yang dilakukan adalah dengan mengganti cara-cara konvensional menjadi lebih modern. Hal ini memunculkan inovasi metode pelaksanaan konstruksi yang mengurangi penggunaan material kayu sebagai bekisting. Pada penelitian ini akan dilakukan perbandingan antara metode pelat konvensional, pelat pracetak segmental dan pelat bondek dari segi waktu, biaya dan struktur yang diambil sample dari 1 lantai yakni lantai 5. Metode pracetak yang digunakan adalah Hollow Core Slab (HCS). Data-data yang dibutuhkan yakni gambar kerja, RAB, Master Scedule, dan AHSP Palembang 2017. Hasil analisa dari segi biaya metode hollow core slab 8,45%, lebih besar dibandingkan dengan metode konvensional. Sedangkan, biaya metode plat bondek 9,56% lebih hemat dibandingkan dengan metode konvensional. Pelaksanaan pekerjaan metode hollow core slab dan bondek 27,3 % lebih cepat dibandingkan dengan metode konvensional, selisih moment metode hollow core slab terhadap metode konvensional adalah 2,47 %, atau momen pada pelat hollow core slab lebih besar dibandingkan dengan pelat konvensional. Sedangkan, pada pelat bondek karena momen yang bekerja diasumsikan sama dengan metode konvensional maka prosentasi momennya adalah 0%.Kata Kunci: Hollow Core Slab (HCS), Konvensional, Pelat Bondek, Perbandingan Waktu, Biaya, dan Struktur.
Perencanaan Sistem Informasi Manajemen Jadwal dan Biaya dengan Menggunakan Metode Earned Value pada Proses Manajemen Konstruksi Yungky Sasmita Prasetya; Darman Katni; Arifien Nursandah
AGREGAT Vol 5, No 1 (2020)
Publisher : Universitas Muhammadiyah Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1357.579 KB) | DOI: 10.30651/ag.v5i1.4978

Abstract

AbstractDevelopment must have clear directions or goals so that planned results can be achieved more optimally. Supervision, evaluation, and control need to be done, especially concerning issues of cost and time of project implementation so that project performance can be known as well as predicting the magnitude of the cost and time of project completion. If the project experiences delays in completion, use the Earned Value Management (EVM) method to control the project time and cost. A construction project implementation will certainly be helped by the existence of an information system. Work delays can be immediately known so that the control process becomes easier. Not only in the process of controlling but also in the process of storing documents and project data, because with the use of information systems the process of storing documents and project data becomes easier and more concise. Therefore the project control information system is designed using the EVM method using the XAMPP application program. Through this information system design, the results of the EVM program output can be validated with the results of manual calculations. The information system that has been created has a user-friendly appearance that will facilitate project actors, especially contractors in conducting performance analysis using the EVM method and also expected that this program can get the right results and reduce the risk of inaccuracy in the calculation.Keywords : Earned Value Management, Performance Analysis, Information Systems, XAMPP application programsAbstrakPembangunan harus mempunyai arah atau tujuan yang jelas sehingga hasil yang direncanakan dapat dicapai lebih optimal. Pengawasan, evaluasi, dan pengendalian perlu dilakukan terutama yang menyangkut masalah biaya dan waktu pelaksanaan proyek sehingga dapat diketahui kinerja proyek serta memprediksi besarnya biaya dan waktu berakhirnya pelaksanaan proyek. jika proyek mengalami keterlambatan penyelesainnya, menggunakan metode Earned Value Management (EVM) dalam mengendalikan waktu dan biaya proyek.. Sebuah pelaksanaan proyek konstruksi tentunya akan terbantu dengan adanya sistem informasi. Keterlambatan pekerjaan dapat langsung diketahui sehingga proses pengendalian jadi lebih mudah. Tidak hanya dalam proses pengendalian tetapi juga dalam proses penyimpanan dokumen dan data-data proyek, karena dengan penggunaan sistem informasi proses penyimpanan dokumen dan data-data proyek menjadi lebih mudah dan ringkas. Oleh karena itu dirancang sistem informasi pengendalian proyek dengan metode EVM ini menggunakan program aplikasi XAMPP. Melalui perancangan sistem informasi ini, hasil dari output program EVM akan dapat dilakukan validasi dengan hasil perhitungan manual. Sistem informasi yang telah dibuat ini memiliki tampilan yang user-friendly sehingga akan memudahkan pelaku proyek khususnya kontraktor dalam melakukan analisa kinerja dengan menggunakan metode EVM dan juga diharapkan dangan program ini dapat memperoleh hasil yang tepat dan mengurangi resiko ketidak telitian dalam perhitungan tersebut.Kata Kunci : Earned Value Management, Analisa Kinerja, Sistem Informasi, program aplikasi XAMP.