Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis dan Identifikasi Sisa Material Konstruksi pada Pekerjaan Beton (Studi Kasus pada pekerjaan Pembangunan Pasar Rakyat Talang Banjar) Elvira Handayani; Fenel Veronata
Jurnal Ilmiah Universitas Batanghari Jambi Vol 19, No 2 (2019): Juli
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (456.342 KB) | DOI: 10.33087/jiubj.v19i2.684

Abstract

In the implementation of a building construction project, it cannot be avoided the emergence of the remaining construction material or called construction waste. The rest of the material is something that is of the nature more than what is required either in the form of work or construction material that is left / scattered / damaged so that it cannot be used again according to its function. The amount of residual material can be minimized by exploring the factors that cause the residual material to occur and the use of a good management system. The more residual material found on the project, it can be interpreted that the smaller the profit from implementing the project.
Analisis Faktor Kinerja Mandor pada Proyek Konstruksi Pembangunan Gedung Kantor Cabang Utama BPD Kota Jambi Elvira Handayani; Ria Zulfiati
Jurnal Ilmiah Universitas Batanghari Jambi Vol 26, No 3 (2026): Oktober
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/jiubj.v26i3.6587

Abstract

Foreman performance is a critical factor determining the success of construction project execution, as the foreman serves as the frontline in managing the workforce and ensuring that work proceeds according to plan. This study aims to identify and analyze the factors influencing foreman performance in the construction project of the main branch office building of the Regional Development Bank (BPD) in Jambi City, as well as to determine the most dominant factor. The research employed a descriptive quantitative approach with saturated sampling involving 45 construction workers as respondents. Data were collected through questionnaires measuring four main factors (individual, work environment, organizational/managerial, and motivation and welfare) comprising 16 variables, and were analyzed using mean scores. The results indicate that the most dominant factor influencing foreman performance is the availability of tools and materials, with a mean score of 4.20, followed by physical and psychological conditions (4.13) and technical work skills (4.10). These findings suggest that project logistics readiness significantly determines the effectiveness of the foreman’s role in controlling on-site work execution. Project management is advised to improve the planning and control systems for tools and materials to enhance overall project efficiency.