Zulbaidah Zulbaidah
Program Studi Teknik Industri, Fakultas Teknik, Universitas Teuku Umar

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

PENENTUAN JUMLAH TENAGA KERJA BERDASARKAN WAKTU STANDAR DENGAN METODE WORK SAMPLING Zulbaidah Zulbaidah; Abdul Malik Ali; Fitriadi Fitriadi
Jurnal Optimalisasi Vol 1, No 1 (2015): Jurnal Optimalisasi
Publisher : Universitas Teuku Umar

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (416.255 KB) | DOI: 10.35308/jopt.v1i1.170

Abstract

Brick molding company has been very flourishing in Nagan Raya, but in this study focuses on molding bricks located at the Blang Bintang, Simpang Maklina, Gampong Cot Beetle, district. Kuala, Nagan Raya. Problems that occur in this company include: determining the standard time work, measuring work time using work sampling method, measuring the working time, calculating standard labor. This study aims to measure the standard time by determining the amount of labor. This research work sampling method. This conduct by direct observation activities of operators in completing the work which is then used to measure the labor force. Standard time operator workload and hours of productive work in completing the work, so that can know the amount of labor that should be employed. The analysis results obtained in this study .2350 minute of normal time, standard time of 0.2355 min, whereas the number of personnel is 0.0532. It can be concluded that the normal time as much as 5.32% so that idle time is still too big.Key Words: Standard Time , Work Sampling , Workload, Labor.